Structural Concrete Contractor Melbourne

Structural concrete contractor Melbourne builders and developers can brief once: suspended slabs, columns, walls and ground beams, built to the engineer’s drawings. Cinerari Contracting runs the drawings, the reinforcement and the pour as one package on commercial and multi-residential buildings. See the formwork and reinforced concrete service behind it, or our commercial concreting.

Structural Concrete for Builders and Developers

Concrete Frames Built to the Engineer's Drawings

A concrete frame only works if three things line up: the engineer’s drawings, the reinforcement and the pour. Cinerari Contracting runs all three under one subcontract across Melbourne and regional Victoria.

Our crew reads the structural drawings, schedules the steel and builds the formwork, then pours and strips. There are no gaps between formwork, steel and pour for your site team to chase.

0 +

Projects Completed

0 ★

Google Star Rating

0 +

Years of Experience

0 %

Customer Satisfaction

Structural Elements We Build

The frame of a commercial or multi-residential building is made of these elements, and we build each one:

  • Suspended slabs over basement carparks
  • Ground floor and podium slabs
  • Upper-floor slabs
  • Columns
  • Ground beams
  • Structural walls
  • Lift cores and stair cores
  • Basement and retaining walls
  • Footings under the frame

Every one of them sits in a load path. The drawings say what carries what, and the crew builds to that.

Why Builders and Developers Choose Us

The gaps between trades are where formwork problems start. When one crew does the formwork, the steel and the pour, those gaps close. We run all three under one subcontract and put a hold point in front of every pour.

Suspended slabs, cores and walls ask a lot of the coordination. We plan penetrations and services with the other trades, schedule the reinforcement in-house and coordinate post-tensioning where the design includes it.

What You Get on aStructural Package

01. Built to the Engineer's Details

Slabs, columns, walls and beams are set out and built the way the structural drawings show them.

02. Reo Scheduled, Then Fixed to Match

The reinforcement is scheduled against the drawings and fixed to that schedule before anything is poured over it.

03. Penetrations Planned Early

Services and cast-in items are coordinated with the other trades so they land in the right place when the concrete goes in.

04. A Checked Base for Every Pour

We stop at each hold point and run pre-pour checks, so the next stage starts from work that has been looked at.

From Drawings to Pour Day

Each element goes through the same checks, in the same order, before concrete is placed.

Drawings & Set-Out

Read the structural drawings and details together

Schedule the reinforcement against the drawings

Set out levels, column positions and wall lines

Plan penetrations and cast-in items with the other trades

Formwork, Steel & Pre-Pour Checks

Build and prop the formwork for slabs, columns and walls

Fix the reinforcement to the schedule

Check alignment and bracing

Sign off at the hold point, then pour

How We Work With Builders

Send the Drawings

Send the Drawings

Share the structural drawings, reinforcement details and your pour programme so we can scope the frame.

Scope, Price and Start Date

Scope, Price and Start Date

We review the drawings, then give you a clear price and a start date that fits your programme.

Built and Checked

Built and Checked

We form, fix and pour in sequence, with a hold point before each pour.

Handed Over Ready

Handed Over Ready

Finished elements are left clean and ready for your next trade.

Who Books Us

We take structural concrete packages from:

Builders on commercial and multi-residential projects

Developers who need the frame built to programme

Head contractors with suspended slabs and cores to deliver

Project managers lining up the engineer, the steel and the pour

Retail, warehouse and factory builds

Packages That Run Alongside

A structural package often sits with:

Concrete footings

Concrete slabs

Concrete retaining walls

Steel fixer labour hire

Our Testimonial

Building SuccessStories, Building Trust

Fill out the form below to contact us.















    Need Help? Contact Us Now.

    Cinerari Contracting delivers professional concrete, formwork and civil construction services with a strong focus on safety, precision and clean handovers. If you’re planning a civil, industrial or commercial project, we’re ready to review your scope and discuss how we can support your works.

    Got Drawings Ready? Call Cinerari Contracting

    Building Frames AcrossMelbourne & Regional Victoria

    Aberfeldie — Albanvale — Albert Park — Albion — Ascot Vale — Ashbourne — Attwood — Avondale Heights — Barfold — Barkers Creek — Barrys Reef — Basalt — Batman — Baynton — Benloch — Beveridge — Blackwood — Bolinda — Braybrook — Broadmeadows — Brooklyn — Brunswick — Bulla — Bullarto — Bullengarook — Bylands — Cadello — Calder Park — Campbellfield — Campbells Creek — Carlsruhe — Carlton — Castlemaine — Cherokee — Chewton — Chewton Bushlands — Chintin — Clarkefield — Clydesdale — Cobaw — Coburg — Coolaroo — Coomoora — Craigieburn — Dallas — Darraweit Guim — Daylesford — Delahey — Denver — Diggers Rest — Docklands — Donnybrook — Drummond — Dry Diggings — Edgecombe — Eganstown — Elevated Plains — Essendon — Faraday — Fawkner — Fern Hill — Fitzroy — Flemington — Footscray — Forbes — Franklinford — Fryerstown — Garden City — Gisborne — Gladstone Park — Glenaroua — Glengala — Glenhope — Glenluce — Glenlyon — Glenroy — Golden Point — Goldie — Gowanbrae — Gower — Greenhill — Greenvale — Guildford — Hadfield — Hanging Rock — Heathcote Junction — Hepburn — Hepburn Springs — Hesket — Hidden Valley — High Camp — Hillside — Hotham Hill — Irishtown — Jacana — Kalkallo — Kealba — Keilor — Keilor Downs — Keilor Lodge — Keilor Park — Kensington — Kerrie — Kilmore — Kings Park — Kingsville — Korweinguboora — Kyneton — Lancefield — Langley — Lauriston — Leonards Hill — Lerderderg — Little Hampton — Lyal — Lyonville — Macedon — Maidstone — Malmsbury — Maribyrnong — Mckenzie Hill — Meadow Heights — Melbourne — Merlynston — Mia Mia — Mickleham — Middle Park — Monegeetta — Moonee Ponds — Moonee Vale — Moonlight Flat — Moranding — Moreland — Mount Franklin — Mount Macedon — Muckleford — Musk — Musk Vale — Myrtle Creek — New Gisborne — Newbury — Newham — Newport — Niddrie — Nulla Vale — Oak Park — Oaklands Junction — Parkville — Pascoe Vale — Pastoria — Pipers Creek — Plumpton — Porcupine Ridge — Port Melbourne — Princes Hill — Redesdale — Riddells Creek — Robinson — Rochford — Romsey — Roxburgh Park— Sailors Falls — Sailors Hill — Seddon — Shepherds Flat — Sidonia — Somerton — South Melbourne — Spargo Creek — Spotswood — Spring Hill — Springfield — St Albans — Strangways — Strathmore — Sumner — Sunbury — Sunshine — Sydenham — Tantaraboo — Taradale — Tarilta — Taylors Hill — Taylors Lakes — Tottenham — Travancore — Trentham — Tullamarine — Tylden — Vaughan — Wallan — Wandong — Westmeadows — Wheatsheaf — Wildwood — Willowmavin — Woodbrook — Woodend — Woodstock — Yandoit — Yandoit Hills — Yapeen — Yarraville — Yuroke

    Frequently asked questions

    We build the concrete frame of a building: suspended slabs, columns, walls, ground beams and the footings under them. Our crew forms it, fixes the reinforcement and pours it, working from the engineer’s drawings.
    Yes. Our structural work covers multi-unit residential, retail, warehouses and factories, on sites with engineer-stamped drawings. We work with builders, developers and head contractors.
    Yes. Basement carpark slabs, ground floor decks and upper-floor slabs are regular scope. We hire and prop the formwork to suit the pour loads, schedule the reinforcement in-house and coordinate post-tensioning where the design includes it.
    We work from the issued structural drawings and plan penetrations and services before the pour. Pre-pour checks happen at each hold point, so the next stage starts from checked work.
    Yes. We own proprietary systems for walls, columns and suspended slabs, and build custom ply forms for odd geometry. The formwork package stays with our crew.
    AS 3600 for concrete structures, plus AS 5100, VicRoads and AustRoads specifications and the standard council and water authority requirements. We build to the engineer’s drawings and the project specification.
    We carry public liability and full workers comp. Insurance certificates are issued on award of the contract.
    For most jobs we can mobilise within 2 to 4 weeks once the drawings are locked in and the contract is signed. Systems with longer lead times, such as jump form or large soffit systems, may need 6 to 8 weeks of pre-planning.

    Ready to brief a structural concrete contractor in Melbourne?

    Builders and developers across Melbourne and regional Victoria brief Cinerari Contracting with the structural drawings and a target start date. Call or request a quote and we’ll tell you what’s in scope.

    How Can We Help You?

    Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.