Concrete foundation contractors earn their keep before a single truck arrives. At Cinerari Contracting we read the drawings, dig to the specified depth, hold every inspection and pour only when the engineer’s checks are signed off. Builders, project managers and civil contractors send us the foundation package and get a clean, correct base to build on.
A footing is out of sight for the life of the building, so the only time to get it right is now. These are the four things we hold ourselves to on every foundation package.
Formwork, reinforcement and the pour are all ours. Form, reo, pour is what we do every day, so there is no gap between trades for a mistake to hide in.
Excavation, bearing, reinforcement and pre-pour checks are built into the programme and recorded with photos. You see what was checked and when.
Plain updates on where the foundations are up to and what is holding the next stage. No chasing, no surprises on pour day.
Organised work areas, proper temporary works and a clean handover, so the next trade walks onto a base that is ready.
Our foundation work runs from simple strips to foundations tied into drainage and plant. Every item below is built to the engineer’s drawings and specification, and you can read more about the full footings and foundations service before you send us a package.
Whatever the element, the order of work is the same. Review the drawings, set out accurately, excavate to depth, confirm the bearing, fix and check the reinforcement, then pour. Good concrete foundation contractors do not skip steps to save an afternoon, and neither do we.
Price matters, but a footing that has to be dug up costs more than any quote. These questions separate a contractor that builds to the drawing from one that builds to the day.
We build to the documented design and do not improvise structural elements. If something on site does not match the drawing, we raise it before we pour.
Ask for them by name. Ours are excavation, bearing confirmation, reinforcement and pre-pour, each with a photo record.
We stop, tell you and the engineer, and wait for direction. We do not pour over soft or unsuitable material to keep the day moving.
Reinforcement is installed strictly to the drawings, with correct cover, spacing and bar size, and checked before the pour.
We coordinate penetrations, starters and embedments with the other trades so they land where the design puts them.
Ask for certificates of currency and tickets before anyone starts. Our crews are ticketed and we carry current cover, and the paperwork is available on request.
A concrete foundation contractor is only as good as its worst unchecked hour. We stop the job at four points and move on only when each is confirmed.
Depth, width and profile checked against the drawings. Unsuitable material removed, base prepared and blinded where specified.
The ground is confirmed as the design expects before reinforcement is placed, so the footing sits on what it was designed for.
Bar size, spacing, cover and fixing checked against the drawings, with photos taken for the record.
Formwork, levels, embedments and access checked once more. Concrete placement is supervised.
Pour day should be the quiet part of the job, because the hard checks have already happened. By the time the first truck arrives, the excavation has been confirmed, the reinforcement has been inspected and the formwork has been set to level.
We walk the work once more before concrete is ordered to site: formwork, levels, embedments and access for the truck and pump. Placement is supervised, and the mix, finishing and curing follow the engineer’s specification, not a habit.
If something does not match the drawings on the morning, we raise it with you and the engineer first. A late pour is an inconvenience. A footing poured wrong is a problem for the life of the building.
When the pour is finished the site is cleaned and the area is left safe for the next trade.
Much of Melbourne sits on clay that swells when it is wet and shrinks when it dries. Australian Standard AS 2870 sorts building sites into classes by how much the ground moves: A, S, M, H1, H2, E and P. The class drives the footing design, and the design belongs to the engineer.
Our part is to build exactly what the engineer specified and to report what the ground tells us. If the excavation shows fill, soft spots or water that the geotechnical report did not mention, you hear about it at the bearing check, not after the pour.
The same discipline applies on the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. For a closer look at footing choices on this ground, the guide to reactive clay footings in Melbourne goes through the site classes.
We are a subcontractor. Our clients are the people who carry the project, not the people who live in the building.
Townhouse and multi-unit builds, commercial buildings and steel-framed structures that need a foundation package priced from the drawings.
Foundations that tie into pits, chambers and service structures, and bases for infrastructure works.
Equipment plinths, machine bases and column footings for sheds, warehouses and processing plant.
Strip and pad footings for on-ground residential and shed designs, where the drawings are straightforward.



The concrete is only part of a foundation package. The rest is how the work is planned, recorded and communicated.
Every package begins with a review of the drawings, levels, geotechnical requirements and sequencing, so the footing system is set out correctly from day one.
We keep site records and photos at each hold point. If a question comes up after handover, there is a record to answer it.
Safe systems, proper temporary works and organised work areas protect our crews, your other trades and the public.
You hear from us when a stage is complete and when something is holding the next one. Problems are raised early, while there is still time to deal with them.
We are based in Melbourne and send crews across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Structural drawings and specification, plus the geotechnical report and programme if you have them.
We read the drawings, check levels and sequencing, and come back with a quote and any questions.
Accurate set-out, controlled excavation to depth, base prepared. First two hold points.
Formwork and reinforcement installed, third and fourth hold points signed off, then supervised placement.
Clean site, photo records and a base ready for the next trade.
We price from your drawings, not from a rate card. A short list of things drives the number on almost every package, and knowing them early helps you budget before the quote arrives.
Because every footing is different, we do not publish figures. Send the drawings and we will quote the job in front of us.
Send us the package or call and tell us about the job. We will come back with a quote and any questions on the design.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about soil classes, standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.