Strip footing construction is long, repetitive work where small errors add up: a trench a little off line, a base a little soft, a run of steel a little short of cover. At Cinerari Contracting we build strip footings under load-bearing walls, townhouses, masonry and civil structures to the engineer’s drawings, with checks at the trench, the ground, the steel and the pour.
Strip footings run for metres at a time, so the discipline has to hold from one end of the trench to the other.
Trenches are set out and checked along their whole length, not only at the corners.
Bearing is confirmed along the trench, so a soft patch is found before steel goes over it.
Bar size, spacing and cover are checked against the drawings before forms are closed.
Photos and site records show what was built along the length of the footing.
A strip footing is a continuous band of reinforced concrete under a wall. It spreads the wall’s load along its length into the ground. We build strips as part of our footings and foundations service.
Whatever the layout, we build to the drawings and check as we go.
A strip footing is simple on paper. These questions show how a contractor keeps it right over its whole length.
Ask how line and level are set and how the set-out is checked before digging.
The bearing check should cover the length of the trench, not a single spot.
Steps should follow the drawn levels, with the overlaps shown on the drawings.
Where a footing is poured in sections, joints should be located as the drawings show.
Steel should be supported so the cover is right along the full length.
Pipes and sleeves through the footing should be coordinated before the pour.
We stop the job at four points, and each one applies to the whole length of the footing.
Line, level, width and depth checked along its length against the drawings.
Bearing confirmed along the trench before steel goes in.
Bar size, spacing and cover checked against the schedule, with photo records.
Formwork, levels, penetrations and access checked. Placement is supervised.
A strip footing wants to sit on firm ground at the right depth along its whole length. On a sloping site, that means the footing steps. The engineer shows the step heights and the overlap at each change of level, and the contractor builds them to the drawing.
A step built wrong is a weak point, so we set out each change of level carefully and check it at the first hold point, before the trench is closed up with steel.
Steps affect the formwork, the steel and the pour sequence. The steel has to follow the profile, and concrete has to be placed so that it fills each step cleanly.
Where the drawings leave a question about a step, we ask the engineer before digging. A question at the set-out stage costs little. The same question after the pour costs a lot.
We are a subcontractor, and our clients carry the project.
Townhouse, multi-unit and commercial builds with long runs of footing.
Footings for structures that tie into service and drainage works.
Strips under workshop and warehouse walls.
Strip footings for on-ground residential and shed designs.



Long runs hide small errors, so we check along the whole length.
Line and level are checked along the length before steel goes in.
The base is prepared and checked so the footing sits at a consistent depth.
The bearing check covers the trench, so a soft patch is found early.
Steel is supported and checked so cover holds along the full length.
Joints between pours are located as the drawings show and prepared before the next pour.
On a long strip, the pour sequence matters as much as the concrete. We agree with you how the truck and pump will reach the trench, where the pour starts, and where each section ends.
The last check before concrete goes in covers the whole run: formwork, levels, penetrations and steel. Placement is supervised so the concrete fills the profile evenly.
After the pour, we check that starters, sleeves and cast-in items are where they should be, and record it.
The site is left tidy and safe, and the records are updated for your file.
Strip footings are repetitive, so the records and routines matter.
We review drawings, levels and the pour sequence before we start.
Site records and photos show what was checked along the run.
Safe systems of work and proper temporary works around open trenches.
You hear when a length of footing is complete and when anything holds the pour.
We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Structural drawings, specification and geotechnical report.
We check the drawings and quote the package with any questions.
Trench set out and excavated, first two checks recorded.
Steel checked, then a supervised pour.
Records ready and the footing clear for the next trade.
We price strip footings from the drawings. A few factors drive the number on almost every job.
Because no two runs of footing match, we do not publish figures. Send the drawings and we will price what is drawn.
Send us the drawings or call and tell us about the job. We will price it from what is drawn and flag anything that needs the engineer’s attention.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.