Footing contractors are judged on the day the next trade arrives and finds a base that is level, correct and signed off. At Cinerari Contracting we take a footing package from your drawings, run it through four recorded checks and hand it back ready for the structure above. Builders, project managers and civil contractors use us as the subcontractor they do not have to chase.
A footing subcontract has one job: take the engineer’s drawings and give you a base you never have to think about again. This is how we approach it.
We write down what is included and what is not, so there is no argument about a starter bar or a pump on pour day.
We plan around your critical dates and tell you early when something threatens them, while there is still room to move.
Nothing is poured until the excavation, bearing, steel and formwork have each been checked and recorded.
Photos, records and a tidy site, so the next trade can start without a clean-up or a question.
A clear package avoids most disputes. This is the list we work to, whether the job is a few footings or a long run of them. The full footings and foundations service sits behind it.
A package like this can be scoped from your drawings alone, and we tell you which assumptions we made when we quote.
A rate and a start date tell you little. These questions tell you how the job will actually run.
Ask for exclusions in writing. We list them so you can see where a variation could arise and plan for it.
Be clear who calls the engineer or certifier and how much notice they need. We build that notice into the programme.
Agree who orders the mix, who arranges the pump and who receives the truck, so the pour does not stall.
Ask how a change is flagged and priced. We stop at the bearing check, tell you and the engineer, and wait for direction.
A footing found wrong after the pour is expensive. Ask how the contractor checks its work before concrete goes in.
Hold point photos and checklists show how a contractor works. Ask what a handover pack looks like.
We stop at four points. Each one is a gate you can see on the programme.
The dig is measured against the drawings for depth, width and line. Loose or unsuitable material comes out and the base is prepared.
The ground is confirmed as the design expects. If it is not, the pour waits for the engineer’s direction.
Steel is checked for size, spacing, cover and fixing against the schedule before forms are closed.
Forms, levels, embedments and access are walked one last time. Concrete is placed under supervision.
The quickest route to a firm quote is a complete package: structural drawings and specification, the geotechnical report, site levels and access details, and your programme. If part of that is missing, send what you have and we will say what else is needed.
We read the drawings against each other before we price. Where two sheets disagree, we ask before the job starts, because a question in week one costs less than a correction in week six.
In return you get a subcontractor who plans the work, keeps you informed and hands over a base with a paper trail. Stage completions, delays and design questions reach you as they happen, not at the end of the week.
When the footings are done, the records are ready for your certifier or engineer, and the site is left tidy for the next trade.
Most problems on footings are not about concrete. They are about information and timing.
We confirm the current revision before set-out and again before the pour, so we never build to a superseded sheet.
Items other trades rely on are listed, coordinated and checked at the pre-pour hold point.
If the excavation shows something the report did not, we stop at the bearing check and tell you and the engineer.
We plan access for trucks, pumps and plant with you before pour day, not on it.
Inspection points sit on the programme with notice built in, so the pour is not held waiting for a visit.
By the morning of the pour, the hard decisions have been made. Excavation is confirmed, bearing is checked, steel is inspected and forms are set. The crew’s job on the day is to place the concrete properly and keep to the plan.
We walk the work once more before the first truck is received: forms, levels, embedments and access. Placement is supervised, and finishing and curing follow the engineer’s specification.
If something on the day does not match the drawings, we raise it with you and the engineer before going on. A pour that waits an hour is an inconvenience. A footing poured wrong is a problem that stays for the life of the building.
When the pour is complete, we clean up, leave the area safe and send you the records so your file is up to date.
We are a subcontractor, so every job starts with someone else’s drawings and someone else’s programme.
Commercial buildings, townhouses and multi-unit work, where the footing package has to land inside a tight sequence.
Foundations that tie into pits, chambers and service structures, and bases for infrastructure works.
Column footings, plinths and bases for sheds, warehouses and plant.
Footings for on-ground residential and shed designs with straightforward drawings.



A footing package is more than the pour. It is also how the work is planned, recorded and kept safe.
We review drawings, levels, geotechnical requirements and sequencing before we start, so set-out is right from day one.
Site records and photos at each hold point give you something to point to if a question comes up later.
Safe systems of work, proper temporary works and organised areas protect our crews, your trades and the public.
You hear when a stage is done and when something is holding the next one. Problems are raised early.
Our crews work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Drawings, specification, geotechnical report and your programme.
We check the sheets against each other and come back with a quote and questions.
Positions marked, excavation to design, first two checks recorded.
Steel and forms checked, third and fourth checks signed off, then a supervised pour.
Records ready, site tidy, base ready for the next trade.
A footing package is priced from the drawings, not from a rate card. The same few things move the number on almost every job, and it helps to know them before the quote arrives.
We do not publish figures because no two packages match. Send the drawings and we will price the job in front of us.
Send us the package or call and tell us about the job. We will read the drawings and come back with a quote and any questions.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.