Footings and foundations · Melbourne and regional Victoria

Commercial building foundations in Melbourne, built to the engineer’s drawings and your programme

★★★★★ Rated 5 out of 5 on Google

Commercial building foundations set the pace for everything built above them. A late or wrong footing holds up steel, slabs and every trade behind them. At Cinerari Contracting we build commercial footings, ground beams and bases from your drawings, with recorded checks before each pour, so the structure starts on time and on a base that is correct.

  • Footings, ground beams and bases
  • Recorded checks before every pour
  • Built to the engineer’s drawings
Cinerari commercial building foundations: concrete wall formwork with angled timber bracing beside red structural steel columns and a mobile crane
★★★★★“What stood out most was their attention to detail and commitment to quality.”nomar group · client review
★★★★★“They completed the work on time, kept the site clean, and were always happy to answer questions and offer helpful suggestions.”NO Shops · client review
10+years of experience across civil, industrial and commercial concrete in Victoria.Cinerari Contracting
Why Cinerari

Why project teams choose Cinerari for commercial building foundations

On a commercial job the foundations sit on the critical path. These are the four things we hold ourselves to.

Sequenced with the structure

We plan the foundation package around the steel, precast or concrete frame that follows it, not in isolation.

Inspections built in

Excavation, bearing, reinforcement and pre-pour checks are programmed so the engineer or certifier can attend without holding the job.

Form, reo, pour in one team

Formwork, reinforcement and concrete placement sit with one contractor, so there is no gap between trades.

Records for the file

Photos and site records at each hold point support your certifier and your handover documents.

What we build

The commercial building foundations we take on

Commercial drawings usually combine several foundation elements in one package. We build each of them, to the structural drawings, as part of our footings and foundations service.

  • Pad and strip footingsUnder columns and load-bearing walls, to the sizes and depths on the drawings.
  • Ground beams and edge beamsLinking footings and stiffening slab edges where the design calls for them.
  • Pile caps and pile headsCaps built after the piling contractor has finished, to the pile layout drawn.
  • Foundations for slabs on groundThe footing system that supports a structural slab.
  • Lift pits, plinths and basesFoundations for equipment and services, coordinated with the other trades.
  • Foundations tied into drainageFootings that work alongside pits, chambers and service structures.

If your drawings include an element not listed here, ask. We will tell you plainly whether it is within what we do.

Aerial view of reinforcement mesh and orange formwork ready for a concrete pour, with two workers on siteAngled timber bracing along a long wall formwork next to a red steel structure, crane and work platform behind
Hold points

Four hold points on every commercial footing package

Commercial work is inspected, and rightly so. Our checks line up with the points an engineer or certifier wants to see.

1

Excavation

Depth, width and line checked against the drawings, with unsuitable material removed and the base prepared.

2

Bearing

Ground confirmed as the design expects before steel goes in. If it differs, we wait for direction.

3

Reinforcement

Size, spacing, cover and fixing checked against the schedule, with photo records.

4

Pre-pour

Formwork, levels, embedments and access checked. Concrete placement is supervised.

Sequencing

How the foundations fit the rest of a commercial build

The foundation package rarely stands alone. Steel erectors, precast crews and the slab team all depend on footing positions, levels and cast-in items being right. We coordinate starters, penetrations and embedments with the trades who rely on them, so they land where the design puts them.

Staging matters on larger buildings. If the structure is built in zones, we can stage the footings to suit, releasing each zone as it is checked and signed off.

Access is the other constraint. Trucks, pumps and plant need a way in, and commercial sites rarely have much room. We plan pour sequences with you, around hoarding, neighbours and deliveries.

Where the drawings leave a question, we raise it early. A question in the first week costs far less than a correction after the pour.

The ground

What the ground means for commercial building foundations

Every commercial design starts with a geotechnical report. It describes the soil, the groundwater and the bearing the engineer can rely on, and the footings are sized from it. Our job is to build what the engineer drew from that information.

Melbourne ground varies widely. Clay that moves with moisture, fill left from earlier uses and rock close to the surface can all appear within a few streets of each other, which is why the bearing check matters on every job.

When the excavation shows something the report did not, we stop and tell you and the engineer. The response might be a deeper footing, a change of founding level or a different treatment, and that decision belongs to the engineer.

We record what was found, with photos, so there is a clear account of the change and the reason for it, and your certifier has what they need.

Who we work for

Who we build commercial foundations for

We are a subcontractor. Our clients carry the project and need a foundation package they can rely on.

Builders and project managers

Commercial buildings and multi-unit developments with a footing package priced from the drawings.

Civil contractors

Foundations for structures that tie into pits, chambers and service works.

Industrial clients

Bases for plant, warehouses and processing buildings.

Developers’ builders

Teams who need dependable foundation crews across several stages.

Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind
Reinforcement cage in a long footing trench, ready for the pre-pour check.
Aerial side view of a large slab reinforcement mesh inside orange formwork beside a building before the pour
Slab reinforcement and formwork in place beside a building.
Orange formwork and timber bracing for stepped concrete seating on a Cinerari site, with orange temporary barrier fencing
Formwork and bracing on a staged concrete structure.
Where packages lose time

Where commercial building foundations lose time, and how we protect yours

On a commercial programme, a few days lost at the foundations can ripple through every trade behind.

Late or changing drawings

We confirm the current revision before set-out and before each pour.

Services in the way

Pits, pipes and conduits that cross footing lines are identified and coordinated with the drainage and service trades.

Inspections that are not planned

Hold points sit on the programme with notice built in.

Tight sites

Access, hoarding and neighbours are planned into the pour sequence.

Cast-in items missed

Starters, ducts and embedments are listed and checked at the last hold point.

Safety and records

Safety, records and communication

A commercial site asks more of a subcontractor than good concrete.

Safe systems of work

Organised work areas, proper temporary works and safe systems protect our crews and your other trades.

A paper trail

Hold point photos and site records give your certifier something to inspect against.

Straight updates

You hear when a stage is done and when something holds the next one. We raise problems early.

A tidy handover

The site is left clean and the base is ready for the next trade.

Engineers and certifiers

How we work with your engineer and certifier on commercial building foundations

The engineer designed the foundations and the certifier signs them off, so both need to see what they expect at the point they expect it. We ask early when each of them wants to inspect and build those visits into the programme.

We keep records as we go. Hold point photos, site notes and the current drawing revision are collected in one place, so when a certifier asks, the answer is ready.

Our role is to build what is drawn and report what we find. We do not alter a design on site. If the ground, a service or a clash needs a decision, it goes to the engineer and the response is recorded.

That discipline keeps the file clean for handover and protects you if a question is raised years later.

Where we work

Commercial building foundations across Melbourne and regional Victoria

We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

How it runs

From drawings to handover, in five steps

Send the package

Structural drawings, specification, geotechnical report and programme.

Review and quote

We check the sheets against each other and quote the package with any questions.

Set out and excavate

Positions set out, excavation to design, first two hold points recorded.

Fix, form and pour

Reinforcement and formwork checked, last two hold points signed off, supervised placement.

Hand over

Records ready and the base clear for the structure above.

What shapes the price

What drives the cost of commercial building foundations

Aerial side view of a large slab reinforcement mesh inside orange formwork beside a building before the pour

We price commercial foundations from the structural drawings. The same few factors drive the number on almost every building, and knowing them early helps your budget.

We do not publish figures because every building is different. Send the drawings and we will price the job in front of us.

  • Scale of the packageNumber and size of footings, beams and bases.
  • Ground conditionsFill, soft ground or water that has to be dealt with first.
  • ReinforcementThe weight and complexity of steel in the design.
  • Access and stagingRoom for trucks and pumps, and whether the work runs in zones.
  • ProgrammeHow tightly the foundations must fit with the structure.
FAQ

Questions about commercial building foundations

What are commercial building foundations?
They are the footings, ground beams, pile caps and bases that carry a commercial building’s loads into the ground. The structural engineer designs them for the building’s weight, use and soil, and the contractor builds them to those drawings.
What types of foundations do commercial buildings use?
Most use a combination: pad footings under columns, strip footings under walls, ground beams linking them, and slab-on-ground foundations. Some also need pile caps where piles are used. The drawings set out which applies.
Do you design the foundations?
No. Your structural engineer designs them. We build exactly what is drawn and raise anything on site that does not match before it becomes a defect.
Can you fit our programme and staging?
Yes. We plan the foundation package around your structure and can stage the work by zone so each area is released once it has been checked and signed off.
How do you work with the engineer and certifier?
We build in their inspection points as hold points on the programme and give them notice. Our photo records and site notes support their inspections.
Do you build pile caps?
Yes. We build the pile caps and pile head foundations once the piling contractor has finished. We do not install piles.
Which areas do you work in?
Our crews work across the Melbourne metropolitan area and regional Victoria, from Sunbury and Gisborne to Kyneton, Castlemaine and Daylesford.
What do you need to quote?
The structural drawings and specification, plus the geotechnical report, site levels, access details and your programme. Send what you have and we will say what else is needed.

Ready to talk about commercial building foundations?

Send us the drawings and your programme, or call and tell us about the building. We will come back with a quote and any questions on the design.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.