Footings and foundations · Melbourne and regional Victoria

Concrete pad footings in Melbourne, sized and built to the engineer’s drawings

★★★★★ Rated 5 out of 5 on Google

Concrete pad footings carry a single point load into the ground: a column, a post, a piece of equipment. Each one is small next to a strip footing, but there can be dozens on a job, and every one has to sit at the right depth, the right size and the right position. At Cinerari Contracting we build concrete pad footings for commercial, industrial and civil work to the engineer’s drawings, with the same recorded checks on every pad.

  • Every pad checked, not a sample
  • Set out from your control points
  • Recorded checks before every pour
Cinerari concrete pad footings: reinforcement bars inside green formwork in a footing trench, braced with timber across the top
★★★★★“The quality of their workmanship was excellent, and they paid close attention to detail throughout the project.”NO Shops · client review
★★★★★“It was started and completed on time.”Rikki, Gisborne · client review
10+years of experience across civil, industrial and commercial concrete in Victoria.Cinerari Contracting
Why Cinerari

Why builders choose Cinerari for concrete pad footings

Pads are repetitive, and repetition is where mistakes hide. This is how we guard against them.

Every pad checked

The checks apply to each pad, not to the first one and a sample after it.

Positions that land

Pads are set out from your control points, so the columns above them land where the design puts them.

Starters held in place

Starter bars and cast-in items are positioned and checked before the pour, not after it.

A record per pad

Photos and site records show what was built at each pad or group of pads.

What pads are for

What concrete pad footings are used for

A pad footing is an isolated block of reinforced concrete under a column, a post or a piece of equipment. The engineer sizes each pad from the load it carries and the ground beneath it. Pads sit within our footings and foundations service.

  • Column padsUnder steel or concrete columns, to the size and depth drawn.
  • Pads under posts and framesFor canopies, supports and light frames.
  • Bases for plant and equipmentPads that carry machinery and services.
  • Stepped and thickened padsWhere the design calls for a deeper or wider section.
  • Pads linked by ground beamsWhere beams tie a group of pads together.

Whether the job is six pads or sixty, the method stays the same.

Long reinforcement cage in a footing trench with blue edge formwork and excavators working in the backgroundAerial view of reinforcement mesh and orange formwork ready for a concrete pour, with two workers on site
Questions to ask

Six questions to ask about concrete pad footings before work starts

Pads are easy to specify and easy to get slightly wrong. These questions show how a contractor controls the detail.

How are positions set out?

Ask which control points are used and how the set-out is checked before digging.

Is every pad checked?

On a long job, ask whether each pad gets a bearing and steel check or only a sample.

What happens at the bottom of the dig?

The bearing check should confirm the ground before steel goes in. We stop and call the engineer if it differs.

How is the steel held at the right cover?

Reinforcement should be supported so it sits at the right cover, not on the ground.

How do starters stay in position?

Starters and cast-in items should be held and checked so they are not displaced during the pour.

Can the pads be poured in stages?

On larger jobs, ask how stages are planned so each one is inspected and released.

Hold points

Four checks on every pad before the pour

We stop the job at four points, and each pad goes through all of them.

1

The dig

Size, depth and position checked against the drawings, with unsuitable material removed.

2

The ground

Bearing confirmed as the design expects before any steel goes in.

3

The steel

Bar size, spacing and cover checked, with starters in place.

4

The pour

Formwork, levels and access checked. Placement is supervised.

Size and depth

Why the size and depth of a pad are not a matter of opinion

The engineer sizes a pad from the load the column delivers and the strength of the ground beneath it. A bigger load or softer ground means a bigger or deeper pad. Because the numbers come from the design, the contractor’s job is to build the pad exactly as drawn.

A pad dug too shallow may not reach the ground the engineer relied on. A pad dug too large costs more concrete and more time without adding anything. Neither is a good result, which is why we check size and depth at the first hold point.

The bottom of the pad matters as much as the dimensions. A loose or disturbed base has to be dealt with before steel goes in, and a wet base has to be addressed first.

If the ground is not what the report described, we stop and tell you and the engineer. The response, such as a deeper pad or a change of founding level, is the engineer’s decision, and we record what was found.

Who we work for

Who we build concrete pad footings for

We are a subcontractor. Our clients carry the project and need dependable foundation crews.

Builders and project managers

Commercial and industrial buildings where pads are one package in a larger programme.

Civil contractors

Bases for structures and equipment on infrastructure works.

Industrial clients

Pads for plant, workshops and warehouses.

Shed and frame builders

On-ground buildings with straightforward drawings.

Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind
A long footing trench with reinforcement in place.
Cleared and levelled construction site with footing positions marked out in the ground
Footing positions marked on a cleared and levelled site.
Concrete wall formwork with angled timber bracing beside red structural steel columns and a mobile crane
Formwork and bracing beside structural steel.
Where pads go wrong

Where concrete pad footings go wrong, and how we prevent it

Most pad problems are small errors repeated across many pads.

A pad in the wrong place

Set-out is checked against the control points before digging, and again before the pour.

Out of level

Levels are checked against the drawings at the last hold point.

A soft bottom

The bearing check catches it before steel goes in.

Starters displaced

Starters are held in position and checked after the pour.

Water in the hole

Water is dealt with before steel goes in, not after.

Pour day

What pour day looks like for a run of pads

On a job with many pads, the pour needs a plan. We agree the sequence with you: which pads go first, how the truck and pump reach them, and who is on site to receive concrete.

Each pad gets a last look before it is poured: formwork, levels, starters and cast-in items. Placement is supervised so the concrete is placed without disturbing the steel.

After each pour we check that starters and cast-in items are where they should be, and record it. If anything has moved, you hear straight away.

At the end of the day, the site is left tidy and safe, and the records are updated for your file.

Safety and records

How we run the job

A pad is a small job. The records around it are what make the whole package dependable.

Planned before digging

We review drawings, control points and sequence before the first pad is set out.

Recorded as we go

Site records and photos show what was checked at each pad.

Safe systems

Safe systems of work and organised areas protect crews and the public.

Updates as we go

You hear when pads have been checked and when anything holds up the next group.

Where we work

Concrete pad footings across Melbourne and regional Victoria

We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

How it runs

From drawings to the last pad, in five steps

Send the drawings

Structural drawings, specification and geotechnical report.

Review and quote

We check the drawings and quote the package with any questions.

Set out and dig

Pads set out and excavated, first two checks recorded.

Fix and pour

Steel and starters checked, then a supervised pour.

Hand over

Records ready and the pads clear for the next trade.

What shapes the price

What affects the price of concrete pad footings

Cleared and levelled construction site with footing positions marked out in the ground

We price pads from the drawings. A handful of factors drive the number on almost every job.

Pad packages vary too much for a published rate. Send the drawings and we will price the job in front of us.

  • Number of padsMore pads means more set-out, digging, steel and checks.
  • Size and depthThe dimensions the design calls for.
  • GroundFill, soft spots or water at the founding level.
  • Steel and startersThe reinforcement and cast-in items each pad carries.
  • AccessHow easily trucks, pumps and plant reach each pad.
FAQ

Questions about concrete pad footings

What is a concrete pad footing?
A pad footing is an isolated block of reinforced concrete that carries the load from a column, post or piece of equipment into the ground. The engineer sizes it from the load and the ground conditions.
How big does a pad footing need to be?
The engineer decides, from the column load and the bearing of the ground. The size is on the drawings, and we build to it.
How deep do pad footings go?
To the depth on the drawings, which depends on the ground and the design. We dig to that depth and check the bearing before any steel goes in.
Do pad footings need reinforcement?
Most do. The drawings set out the bar size, spacing and cover, and we fix and check the steel against them.
Can you build a large number of pads on one job?
Yes. We plan the sequence with you and check every pad, so the last one is built to the same standard as the first.
Do you build the columns or the steel above?
No. We build the footings and bases. The steel or concrete structure above is another trade’s work, and we coordinate with them on positions and cast-in items.
Which areas do you cover?
Pads are built across metropolitan Melbourne and regional Victoria, including Sunbury, Gisborne, Woodend, Kyneton and Daylesford.
What do you need to quote?
The structural drawings and specification, plus the geotechnical report and site access details. Send what you have and we will say what else is needed.

Ready to talk about concrete pad footings?

Send us the drawings or call and tell us about the job. We will come back with a quote and any questions on the design.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.