Footings and foundations · Melbourne and regional Victoria

Slab and footing packages in Melbourne, built in the right order

★★★★★ Rated 5 out of 5 on Google

A slab and footing package is one of the most common pieces of concrete work on a building site, and one of the easiest to get wrong. The footings, the edge beams and the slab depend on each other, and the order they are built in affects the result. At Cinerari Contracting we build the footings, ground beams and edge beams that support slabs on ground to the engineer’s drawings, in a sequence that suits your programme.

  • Footings, ground beams and edge beams
  • Built to the engineer’s drawings
  • Recorded checks before every pour
Cinerari slab and footing: aerial view of reinforcement mesh and orange formwork ready for a concrete pour, with two workers on site
★★★★★“It’s clear they take pride in what they do and genuinely care about delivering a high-quality result.”NO Shops · client review
★★★★★“They delivered a fantastic final result.”nomar group · client review
50+projects completed across civil, industrial and commercial sites in Victoria.Cinerari Contracting
Why Cinerari

Why builders choose Cinerari for slab and footing work

The footing and the slab are one system, so we plan them as one. This is how.

Planned as one system

We read the footing, edge beam and slab details together, so the order of work suits the design.

Edge details right

Edge beams and thickened edges are formed and reinforced as drawn, because the slab edge depends on them.

Penetrations coordinated

Services that cross footings and edge beams are coordinated before the pour.

Recorded checks

Excavation, bearing, steel and pre-pour checks are recorded with photos.

What we build

What a slab and footing package includes

Under and around a slab on ground sits a system of footings and beams. We build the foundation system as part of our footings and foundations service.

  • Footings under walls and columnsStrips and pads that carry load into the ground.
  • Edge beams and thickened slab edgesThe stiffened edge that supports the slab perimeter.
  • Ground beamsBeams that link footings and spread load across the system.
  • Foundations supporting structural slabsThe base that a structural slab on ground relies on.
  • Starters and penetrationsStarter bars and sleeves for the trades above.

If you also need the slab itself in the same programme, ask us. We will tell you what we can offer and when.

Aerial side view of a large slab reinforcement mesh inside orange formwork beside a building before the pourWorker in hi-vis walking along finished concrete tiered seating steps beneath a shade sail
Questions to ask

Six questions to ask about a slab and footing package before work starts

Because the parts depend on each other, the order and the detail matter. These questions show how a contractor handles both.

What order are the elements built in?

Ask whether the footings and edge beams are poured first or together with the slab, and why.

How are edge beams formed?

The edge should be formed and reinforced as drawn, because the slab perimeter depends on it.

How are services coordinated?

Pipes and sleeves through footings and beams should be agreed before the pour.

What happens if the ground is different?

If the ground is not what the design assumed, we stop at the bearing check and wait for the engineer’s direction.

How is the site prepared for the slab?

Ask what happens to the surface between the footings before the slab is placed.

Who inspects, and when?

Inspection points should be on the programme with notice built in.

Hold points

Four checks on a slab and footing package

We stop the job at four points, so the foundation system is right before the slab goes down.

1

Excavation

Footing and beam excavations checked against the drawings for depth, width and line.

2

Bearing

The ground checked against what the design assumed, before any steel is placed.

3

Reinforcement

Steel in footings and edge beams checked against the schedule, with photo records.

4

Pre-pour

Formwork, levels, penetrations and access checked. Placement is supervised.

The order of work

Footings first, or together with the slab?

The answer is on the drawing. Some designs call for the footings and edge beams to be poured first, with the slab following. Others pour the edge beams with the slab in one sequence. The structural detail decides, and we follow it.

The choice changes the formwork, the pour sequence and the way the site is accessed. We raise it with you at the start, so the programme reflects the design and not a guess.

If the drawings are unclear on the sequence, we ask the engineer before work begins. It is a simple question, and the wrong answer is expensive.

Whatever the sequence, the checks are the same: the excavation, the ground, the steel and the pre-pour check, each recorded.

The ground

Slab and footing foundations on reactive clay

Much of Melbourne sits on clay that swells when it is wet and shrinks when it dries. Many residential and light commercial designs follow Australian Standard AS 2870, which sorts sites into classes by how much the ground moves: A, S, M, H1, H2, E and P.

The class drives the design of the footings and the slab edge, and the design belongs to the engineer. Our part is to build exactly what is drawn.

That includes the detail around the slab edge. Edge beams, thickened edges and the footings beneath them are what resist movement, so we form and reinforce them as drawn.

If the excavation shows something the report did not, such as fill or soft ground, we stop and tell you and the engineer before going on.

Who we work for

Who we build slab and footing packages for

We are a subcontractor. Our clients carry the project and need a foundation system they can rely on.

Builders and project managers

Townhouse, multi-unit and commercial buildings on slabs on ground.

Civil contractors

Bases and slabs that tie into service and drainage structures.

Industrial clients

Foundations for sheds, workshops and warehouses.

On-ground house and shed builds

On-ground residential and shed designs.

Aerial view of reinforcement mesh and orange formwork ready for a concrete pour, with two workers on site
Reinforcement and formwork ready before a pour.
Finished concrete tiered seating steps with a worker in hi-vis walking across them, shade sail above
Finished concrete steps with a worker in hi-vis.
Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind
A long footing trench with reinforcement in place.
Where packages go wrong

Where slab and footing work goes wrong, and how we prevent it

Most problems come from the places where the parts meet.

The wrong order of work

We confirm the sequence with the drawings before work starts.

Edges out of line or level

Edge forms are checked against the drawings at the last hold point.

Penetrations missed

Sleeves and pipes are coordinated before the pour.

A soft base

The bearing check catches it before steel goes in.

Water on the site

Water is dealt with before steel goes in.

Pour day

What pour day looks like for a slab and footing package

On a package with several pours, we agree the sequence with you: which elements are poured first, how the truck and pump reach them, and who is on site to receive concrete.

Before each pour we check formwork, levels, penetrations and steel. Placement is supervised, and finishing and curing follow the engineer’s specification.

After each pour we check that starters and cast-in items are where they should be, and record it.

At the end of the day the site is left tidy and safe, and the records are updated for your file.

Safety and records

How we run the job

A foundation system has many parts, so the records around it matter.

Planned as one system

We review drawings, levels and the sequence of pours before we start.

Recorded as we go

Site records and photos show what was checked at each stage.

Safe systems

Safe systems of work and organised areas around footings and edges.

Clear updates

You hear when each element is done and when something holds the next stage.

Where we work

Slab and footing work across Melbourne and regional Victoria

We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

How it runs

From drawings to handover, in five steps

Send the drawings

Structural drawings, specification and geotechnical report.

Review and quote

We read the footing and slab details together and quote with any questions.

Set out and excavate

Footings and beams set out and excavated, first two checks recorded.

Fix, form and pour

Steel and forms checked, then a supervised pour.

Hand over

Records ready and the foundation system clear for the next stage.

What shapes the price

What affects the price of a slab and footing package

Finished concrete tiered seating steps with a worker in hi-vis walking across them, shade sail above

We price slab and footing packages from the drawings. A few factors drive the number on almost every job.

We do not publish a figure for this work, because every design differs. Send the drawings and we will price it.

  • Footing and beam quantityThe length and size of footings, ground beams and edge beams.
  • Depth and groundThe depth the design calls for and any fill or soft ground on the way down.
  • SteelThe amount of reinforcement in footings and edges.
  • SequenceWhether elements are poured separately or together.
  • Access and programmePlant access and how tightly the slab follows.
FAQ

Questions about slab and footing work

What is a slab and footing?
It is the foundation system under a building on a slab: the footings and beams that carry load into the ground, and the slab that forms the floor. The engineer designs them together, and the order they are built in matters.
Does a concrete slab need footings?
Most slabs on ground rely on edge beams or footings around the perimeter, and often under walls or columns. The drawings show what your design needs.
Can a footing and a slab be poured together?
Sometimes. Some designs pour the slab and edge beams in one sequence, others call for the footings first. We follow the drawing and raise any question with the engineer before the pour.
Do you build the slab as well?
We build the footings, ground beams and edge beams that support slabs on ground. If you need the slab itself in the same programme, ask us and we will tell you what we can offer.
What is an edge beam?
An edge beam is a thickened, reinforced edge around a slab. It stiffens the perimeter and helps the slab resist movement in the ground.
Do you work on reactive clay sites?
Yes. Many Melbourne sites are reactive clay, and the engineer designs the footings and slab edge to suit the class of site. We build exactly what is drawn.
Which areas do you cover?
We work across metropolitan Melbourne and regional Victoria, including Riddells Creek, Gisborne, Kyneton, Kilmore and the growth corridors.
What do you need to quote?
The structural drawings and specification, the geotechnical report and site access details. Send what you have and we will say what else is needed.

Ready to talk about your slab and footing package?

Send us the drawings or call and tell us about the job. We will read the footing and slab details together and come back with a quote.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.