Footing vs foundation is one of the most misused pairs of words in building. In everyday speech people say foundation for the concrete base under a building. In the National Construction Code, the foundation is the ground, and the footing is the construction that transfers the load to it.[1][2]
This guide explains the difference, the common types of footing, why the ground matters so much and what the code says about bearing and walls. It is a terminology guide and not a design guide. Your engineer sets the depth and size, and we build to the drawings.
Related reading
- Our service: Footings & Foundations
- Our service page: Concrete Foundation Contractors Melbourne
- Related guide: Pad Footing vs Strip Footing Melbourne: When Each Wins
- Related guide: Reactive Clay Footings in Melbourne: Class M, H and E Site Solutions
Footing vs Foundation: The Code Definitions
The NCC’s definition of footing is construction that transfers the load from the building to the foundation, and its definition of foundation is the ground which supports the building.[1][2] The CCAA’s guide to residential floors uses the same wording for the footing.[3]
The ground
Foundation
The soil or rock that supports the building[1][2]
The construction
Footing
The element that transfers load to the ground[1][3]
Mixed
Everyday speech
People often say foundation for the whole concrete base[6]
That is the Australian usage. Some sources, and many American websites, use foundation for the whole constructed base, which is why the words get confused. When you read a drawing or a quote, ask which one is meant.
Footing vs Foundation: Types of Footing
The CCAA says a footing can be anything from a strip footing through to a waffle raft.[3] The simplest is the strip footing, which is rectangular in section and generally used to support continuous walls.[3] At the other end, slab footings consist of concrete beams and floors across the entire floor plan.[7] The footing vs foundation question matters most when a quote or drawing uses both words loosely.
| Footing | What it is | Typical use |
|---|---|---|
| Strip footing | Rectangular in section, supporting a continuous wall[3] | Under walls |
| Pad footing | An isolated block under a column or post | Under columns |
| Footing slab or raft | Concrete beams and floors across the entire floor plan[7] | Slab-on-ground buildings |
| Waffle raft | A stiffened raft with closely spaced ribs constructed on the ground[2] | Slab-on-ground buildings |
The NCC Housing Provisions state that all masonry walls must be supported on strip footings.[4] Which type suits your job depends on the building, the loads and the ground.
Footing vs Foundation: Why the Ground Decides the Design
Because the foundation is the ground, the ground decides the footing. The NCC Housing Provisions set out that footings and slabs be founded in natural soil with an allowable bearing pressure of not less than 100 kPa for the deemed-to-satisfy design,[4] and that is the starting point, not the end. In the footing vs foundation question, the ground is the one thing we cannot choose, so everything else is chosen to suit it.
CSIRO’s guide notes that most buildings suffering movement problems are founded on clay soils.[5] Swelling foundation soil during rainy periods lifts the most exposed extremities of the footing system first.[5] That is why a site classification and a footing design go together, and why we never choose a footing from habit.
A footing under construction on a Cinerari site, built to the engineer’s drawing.
Footing vs Foundation: Which Comes First?
The foundation does, because the ground is already there. The footing is what gets built on it. In a construction sequence, the foundation is investigated and classified first, the engineer designs the footing for it and the contractor builds the footing to the drawing. On every job, the footing vs foundation order is the same: ground first, then the footing.
1
Investigate the ground
A geotechnical report describes the foundation.
2
Classify the site
The classification feeds the design.
3
Design the footing
The engineer sizes it for the load and the ground.
4
Build the footing
Excavate, check the bearing, fix steel and pour.
★★★★★
“They completed the work on time, kept the site clean, and were always happy to answer questions and offer helpful suggestions.”
NO Shops · client review
Footing vs Foundation: What It Means When You Read a Quote
Words matter in a quote. A line that says foundations could mean the excavation, the footings, the slab or all three. Ask for the scope in plain terms. A clear footing vs foundation split in the scope removes most of the later arguments.
Avoid
- A single line called foundations with no breakdown
- Assuming the ground has been investigated
- Taking a depth from another site
- Mixing the terms in a scope of work
Do
- Separate lines for excavation, footings and slab
- A geotechnical report or site classification
- Depth and size from the engineer’s drawing
- Defined terms in the scope
We list excavation, formwork, reinforcement, concrete and records separately, so two quotes can be compared line by line.
Questions to Ask About Footings and Foundations
What is the ground?
The geotechnical report and the site class.[5] (See our approach to footings and foundations.)
Which footing is drawn?
Strip, pad, raft or another type.[3]
What bearing is assumed?
The design assumes an allowable bearing pressure.[4]
How is it inspected?
Bearing and steel checks before the pour.
What changes if the ground is different?
The engineer decides the response.
What is excluded?
Ask for exclusions in writing.
Settle the footing vs foundation wording in writing before the work starts, so everyone means the same thing.
How We Work With You
1
Talk to us about your scope
Send drawings, geotechnical report and site conditions.
2
Confirm plan and pricing
We review the documents and give clear pricing based on scope and site conditions.
3
Accurate delivery
Inspection hold points keep the work accurate, with photo records.
4
Clean handover
The work is ready for the next trade, with a tidy site and clear communication.
Get a Footings and Foundations Quote for Your Melbourne Project
Cinerari Contracting builds footings and foundations for civil, industrial and commercial projects and selected residential works across Melbourne and regional Victoria. Send the drawings and site details, and we’ll price it.
What Is the Difference Between a Footing and a Foundation?
In the NCC, the foundation is the ground which supports the building, and the footing is the construction that transfers the load from the building to the foundation.[1][2]
Is a Footing Part of the Foundation?
In the code’s terms, the footing sits on the foundation, which is the ground. In everyday speech people often call the whole concrete base the foundation.
What Comes First, Footing or Foundation?
The foundation, because it is the ground. The footing is built on it after the ground has been investigated and the footing designed.
What Are the Types of Footing?
Strip footings, pad footings and slab-based footings such as stiffened and waffle rafts. The CCAA says a footing can be anything from a strip footing to a waffle raft.[3]
Do Masonry Walls Need Strip Footings?
The NCC Housing Provisions say all masonry walls must be supported on strip footings.[4]
How Deep Should a Footing Be?
The engineer sets the depth and size from the ground and the loads. We have not quoted a figure because it varies with the site.
More Concrete and Civil Guides
Read next
Footings in Tottenham — Industrial Sites, Contaminated Fill, and Structural Concrete
Continue reading →
About the author
Luke Cinerari, Director, Cinerari Contracting
Luke leads Cinerari Contracting, a Melbourne civil and reinforced concrete subcontractor working with builders, developers and civil contractors across metropolitan Melbourne and regional Victoria. Cinerari builds retaining walls, footings, slabs, pits, culverts and site establishment works to the engineer’s drawings.
Phone: 0400 692 550 · Email: hello@cineraricontracting.com
Sources
- Australian Building Codes Board, NCC 2016 Volume Two, Part 1.1 Interpretation
- Australian Building Codes Board, NCC 2022 Volume One Glossary
- Cement Concrete & Aggregates Australia, Guide to Residential Floors (T49)
- Australian Building Codes Board, NCC 2022 Housing Provisions, Part 4.2 Footings, slabs and associated elements
- CSIRO, Foundation Maintenance and Footing Performance
- OnShift, Fieldbook Chapter 12: From Ground to Floor
- RMIT University, BuildRight Footing systems: Concrete slabs
Information in the concreting industry changes frequently. Requirements differ by council and by site, and linked content may change or become outdated. Please always contact us for help with your important building decisions.