Strip footing construction in Melbourne for walls that need a continuous base

★★★★★ Rated 5 out of 5 on Google

Strip footing construction is long, repetitive work where small errors add up: a trench a little off line, a base a little soft, a run of steel a little short of cover. At Cinerari Contracting we build strip footings under load-bearing walls, townhouses, masonry and civil structures to the engineer’s drawings, with checks at the trench, the ground, the steel and the pour.

  • Continuous footings under walls
  • Stepped footings on sloping sites
  • Recorded checks before every pour
Cinerari strip footing construction: long reinforcement cage in a footing trench with blue edge formwork and excavators working in the background
★★★★★“The team was punctual, professional, and very knowledgeable, making the whole process smooth and stress-free.”nomar group · client review
★★★★★“They completed the work on time, kept the site clean, and were always happy to answer questions and offer helpful suggestions.”NO Shops · client review
50+projects completed across civil, industrial and commercial sites in Victoria.Cinerari Contracting
Why Cinerari

Why builders choose Cinerari for strip footing construction

Strip footings run for metres at a time, so the discipline has to hold from one end of the trench to the other.

Line and level from end to end

Trenches are set out and checked along their whole length, not only at the corners.

The ground checked as we go

Bearing is confirmed along the trench, so a soft patch is found before steel goes over it.

Steel to the schedule

Bar size, spacing and cover are checked against the drawings before forms are closed.

Records for the run

Photos and site records show what was built along the length of the footing.

What strip footings are for

Where we use strip footing construction

A strip footing is a continuous band of reinforced concrete under a wall. It spreads the wall’s load along its length into the ground. We build strips as part of our footings and foundations service.

  • Under load-bearing wallsMasonry and structural walls that carry the building’s load.
  • Townhouse and multi-unit buildsLong runs of footing under party and external walls.
  • Boundary and structural wallsWhere the drawings call for a continuous base.
  • Stepped footings on slopesStrips that step up or down with the ground, to the drawn levels.
  • Footings linked to pads and beamsWhere strips meet pads or ground beams in the design.

Whatever the layout, we build to the drawings and check as we go.

Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behindWorkers in hard hats and hi-vis fixing stepped formwork, with orange safety barriers and a bulk bag in the foreground
Questions to ask

Six questions to ask before strip footing construction begins

A strip footing is simple on paper. These questions show how a contractor keeps it right over its whole length.

How is the trench set out?

Ask how line and level are set and how the set-out is checked before digging.

How is the bottom checked?

The bearing check should cover the length of the trench, not a single spot.

How are steps handled on slopes?

Steps should follow the drawn levels, with the overlaps shown on the drawings.

How are joints between pours managed?

Where a footing is poured in sections, joints should be located as the drawings show.

How is cover maintained?

Steel should be supported so the cover is right along the full length.

Who coordinates penetrations?

Pipes and sleeves through the footing should be coordinated before the pour.

Hold points

Four checks on every run of strip footing

We stop the job at four points, and each one applies to the whole length of the footing.

1

The trench

Line, level, width and depth checked along its length against the drawings.

2

The ground

Bearing confirmed along the trench before steel goes in.

3

The steel

Bar size, spacing and cover checked against the schedule, with photo records.

4

The pour

Formwork, levels, penetrations and access checked. Placement is supervised.

Sloping sites

Stepping a strip footing on sloping ground

A strip footing wants to sit on firm ground at the right depth along its whole length. On a sloping site, that means the footing steps. The engineer shows the step heights and the overlap at each change of level, and the contractor builds them to the drawing.

A step built wrong is a weak point, so we set out each change of level carefully and check it at the first hold point, before the trench is closed up with steel.

Steps affect the formwork, the steel and the pour sequence. The steel has to follow the profile, and concrete has to be placed so that it fills each step cleanly.

Where the drawings leave a question about a step, we ask the engineer before digging. A question at the set-out stage costs little. The same question after the pour costs a lot.

Who we work for

Who we build strip footings for

We are a subcontractor, and our clients carry the project.

Builders and project managers

Townhouse, multi-unit and commercial builds with long runs of footing.

Civil contractors

Footings for structures that tie into service and drainage works.

Industrial clients

Strips under workshop and warehouse walls.

On-ground house and shed builds

Strip footings for on-ground residential and shed designs.

Long reinforcement cage in a footing trench with blue edge formwork and excavators working in the background
A long reinforcement cage in a footing trench with edge formwork.
Reinforcement bars inside green formwork in a footing trench, braced with timber across the top
Reinforcement inside green formwork, braced with timber.
Cleared and levelled construction site with footing positions marked out in the ground
Footing positions marked on a cleared site.
Where strips go wrong

Where strip footing construction goes wrong, and how we prevent it

Long runs hide small errors, so we check along the whole length.

A trench off line

Line and level are checked along the length before steel goes in.

An uneven bottom

The base is prepared and checked so the footing sits at a consistent depth.

Weak ground in places

The bearing check covers the trench, so a soft patch is found early.

Short cover

Steel is supported and checked so cover holds along the full length.

Messy joints

Joints between pours are located as the drawings show and prepared before the next pour.

Pour day

What pour day looks like on a long run

On a long strip, the pour sequence matters as much as the concrete. We agree with you how the truck and pump will reach the trench, where the pour starts, and where each section ends.

The last check before concrete goes in covers the whole run: formwork, levels, penetrations and steel. Placement is supervised so the concrete fills the profile evenly.

After the pour, we check that starters, sleeves and cast-in items are where they should be, and record it.

The site is left tidy and safe, and the records are updated for your file.

Safety and records

How we run the job

Strip footings are repetitive, so the records and routines matter.

Planned before the first cut

We review drawings, levels and the pour sequence before we start.

Recorded as we go

Site records and photos show what was checked along the run.

Safe systems

Safe systems of work and proper temporary works around open trenches.

Clear updates

You hear when a length of footing is complete and when anything holds the pour.

Where we work

Strip footing construction across Melbourne and regional Victoria

We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

How it runs

From the first trench to handover, in five steps

Send the drawings

Structural drawings, specification and geotechnical report.

Review and quote

We check the drawings and quote the package with any questions.

Set out and dig

Trench set out and excavated, first two checks recorded.

Fix and pour

Steel checked, then a supervised pour.

Hand over

Records ready and the footing clear for the next trade.

What shapes the price

What affects the price of strip footing construction

Cinerari worker in a hard hat and hi-vis carrying a tool beside orange stepped formwork on a worksite

We price strip footings from the drawings. A few factors drive the number on almost every job.

Because no two runs of footing match, we do not publish figures. Send the drawings and we will price what is drawn.

  • Length and layoutThe total run of footing and how many corners and junctions it has.
  • Width and depthThe section the design calls for.
  • Ground and slopeFill, soft spots, water, and the number of steps on a sloping site.
  • SteelBar sizes and the amount of reinforcement along the run.
  • AccessHow easily trucks, pumps and plant reach the trench.
FAQ

Questions about strip footing construction

What is a strip footing?
A strip footing is a continuous band of reinforced concrete under a wall. It spreads the wall’s load along its length into the ground.
How deep and wide should a strip footing be?
The engineer decides from the wall’s load and the ground. The depth and width are on the drawings, and we build to them.
Do strip footings need reinforcement?
Most do. The drawings set out the steel, and we fix and check it against them before the forms are closed.
How do you build a strip footing on a slope?
The footing steps to follow the ground, with the step heights and overlaps drawn by the engineer. We set out each change of level carefully and check it before steel goes in.
What is the difference between a strip footing and a pad footing?
A strip runs continuously under a wall. A pad sits under a single column or point load. Many buildings use both, and the drawings show where.
Can you pour a long footing in sections?
Yes, where the drawings allow it. We plan the sections with you and locate joints as drawn.
Which areas do you cover?
We build strip footings across metropolitan Melbourne and regional Victoria, from the growth corridors to Kilmore, Broadford and Castlemaine.
What do you need to quote?
The structural drawings and specification, plus the geotechnical report and site access details. Send what you have and we will say what else is needed.

Ready to talk about strip footing construction?

Send us the drawings or call and tell us about the job. We will price it from what is drawn and flag anything that needs the engineer’s attention.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.