Stormwater pit sizes are not a single table. The size of a pit depends on the pipe going into it, how deep it is, who has to get inside it and what drives over the lid. Each Victorian council publishes its own standard drawings, so the right size is the one on the drawing your council approves.
This guide explains what sets the size, shows the examples that Victorian authorities publish and explains how to check yours. We do not call any size the standard Australian size, because there is not one. We build concrete pits to the engineer’s drawings.
Related reading
- Our service: Concrete Pits & Chambers
- Our service page: Concrete Pits Melbourne
- Related guide: Stormwater Pit Installation in Melbourne: A Builder’s Guide
- Related guide: Sump Pit: What It Is and How It Works
Why There Is No Single Answer on Stormwater Pit Sizes
Wyndham City Council’s guidelines say drainage pits, including junctions and inlets, are to be in accordance with the council’s standard drawings.[5] That sentence is the key to the whole subject. The council decides, through its drawings, and the designer works to them.
Diameter
Pipe
The outlet pipe sets the minimum width[2][3]
Deeper
Depth
Deeper pits need more room and access[2]
Load class
Lid
What drives over the lid sets the cover class[1][4]
If you see a table of standard stormwater pit sizes from a merchant, treat it as a product range, not a rule. The size that matters is the one your council or road authority requires.
What Sets Stormwater Pit Sizes
Three things come up again and again in council standards. The first is the pipe. Merri-bek City Council’s technical note says to size the pit to suit the outlet pipe.[3] Mornington Peninsula Shire’s standard plan gives a width rule: pit width equals pipe diameter plus 150 mm, and for pipes over 900 mm it is pipe diameter plus 300 mm.[2]
The second is depth. Mornington Peninsula’s plan calls for a minimum 900 x 900 mm size once pits are deeper, and its table of minimum internal dimensions by depth uses 600 x 600, 900 x 600 and 900 x 900.[2] The third is load class, which sets the cover and does not set the pit size.[1][4]
| Factor | What it changes | Example from a Victorian source |
|---|---|---|
| Outlet pipe | Minimum width and length | Pit width equals pipe diameter plus 150 mm[2] |
| Depth | Internal size, step irons and wall reinforcement | Step irons in pits deeper than 900 mm, or 1 m in other standards[1][2][3] |
| Lid class | Cover strength | Class D covers in the road reserve (VPA); Class C in crossovers and Class B in driveways (Yarra)[1][4] |
| Pit type | Inlet width | Side entry grated pits in 0.9 m and 2 m inlet widths[3] |
Stormwater Pit Sizes: Examples From Victorian Councils
The examples below show the range, and they are not a menu. They come from documents of different ages, so always check the current standard drawing. Taken together, the stormwater pit sizes above show a pattern: the pipe sets the minimum and the depth pushes it up.
Growth areas manual
Side entry pits are 900 x 600 inside for pipes up to 450 mm, with walls and floor 150 mm thick to a depth of 3,600 mm and 200 mm beyond that.[1]
Mornington Peninsula
Pit width is pipe diameter plus 150 mm, and 900 x 900 for the deeper pits in its table.[2]
Merri-bek
Pits over 2 m deep have F72 reinforcing fabric placed centrally in the walls, and step irons go in above 1 m.[3]
Yarra
An existing council pit must be at least 600 x 900 mm to connect to.[4]
Wyndham
Grated inlets only, and a rainwater tank outlet pit of at least 450 x 450 mm with a grated cover.[5]
The growth areas manual also sets a maximum spacing of 90 m for kerb inlet pits in one of its design cases, which is a reminder that size and spacing are separate decisions.[1]
Stormwater Pit Sizes, Depth and Safe Access
Once a pit is deep enough for someone to enter, access becomes part of the size. The growth areas manual calls for step irons in pits deeper than 900 mm.[1] Mornington Peninsula uses 1.0 m and Merri-bek uses 1 m.[2][3] The numbers differ, and the principle is the same.
Formwork materials laid out ready for a pit and structure package.
Deeper pits also carry more soil and water pressure on the walls. The growth areas manual increases wall and floor thickness at 3,600 mm, and Merri-bek adds reinforcing fabric to pits deeper than 2 m.[1][3]
Lid Class Is Not Stormwater Pit Size
People often mix up the two. The lid class describes the load the cover can carry, and it depends on where the pit is. The growth areas manual specifies Class D covers for pits in the road reserve subject to traffic loading.[1] Yarra uses Class C lids within crossovers and Class B lids within driveways and front areas.[4]
Avoid
- Assuming a bigger pit needs a heavier lid
- Using a lid class from another location
- Choosing a pit size from a merchant’s catalogue
- Copying a drawing from another council
Do
- Matching the lid class to where the pit sits
- Checking the council’s standard drawing
- Sizing the pit to the outlet pipe and depth
- Confirming sizes with the engineer
How to Check Stormwater Pit Sizes for Your Site
1
Find the standard drawing
Ask the council or road authority for the current pit drawing.
2
Confirm the pipe
The outlet pipe diameter sets the minimum.[3]
3
Check the depth
Depth sets internal size and access.[2]
4
Confirm the lid class
The location sets the load.[1][4]
Then check the drawings you have been given against the council’s standard. If they differ, ask the designer which governs before the pit is poured. We build to the drawings and raise differences before the pour. Checking stormwater pit sizes against the council’s drawing takes minutes, and correcting them after the pour takes much longer.
★★★★★
“What stood out most was their attention to detail and commitment to quality.”
nomar group · client review
How We Work With You
1
Talk to us about your scope
Send drawings, pit schedule and site conditions.
2
Confirm plan and pricing
We review the documents and give clear pricing based on scope and site conditions.
3
Accurate delivery
Inspection hold points keep the work accurate, with photo records.
4
Clean handover
The work is ready for the next trade, with a tidy site and clear communication.
Get a Pit and Chamber Quote for Your Melbourne Project
Cinerari Contracting builds concrete pits and chambers for civil, industrial and commercial projects and selected residential works across Melbourne and regional Victoria. Send the drawings and site details, and we’ll price it.
What Size Is a Stormwater Pit?
There is no single size. It depends on the council’s standard drawing, the pipe, the depth and the lid class. One Victorian growth areas manual shows 900 x 600 mm inside for side entry pits with pipes up to 450 mm.[1]
How Wide Should a Stormwater Pit Be?
Mornington Peninsula Shire’s standard plan sets pit width as pipe diameter plus 150 mm, or plus 300 mm for pipes over 900 mm.[2]
How Deep Can a Stormwater Pit Be?
Depth depends on the drain’s levels, and deeper pits need more room, step irons and thicker or reinforced walls under the standards above.[1][2][3]
What Is a Side Entry Pit?
It is a pit that takes water through an opening in the kerb face. Merri-bek’s standard shows side entry grated pits with 0.9 m and 2 m inlet widths.[3]
What Is the Minimum Pit I Can Connect To?
Yarra City Council says an existing council pit must be at least 600 x 900 mm and in good condition to connect to, or it is rebuilt to council standard.[4]
What Lid Class Do I Need?
It depends on where the pit is. The growth areas manual specifies Class D in the road reserve, and Yarra uses Class C in crossovers and Class B in driveways.[1][4]
More Concrete and Civil Guides
About the author
Luke Cinerari, Director, Cinerari Contracting
Luke leads Cinerari Contracting, a Melbourne civil and reinforced concrete subcontractor working with builders, developers and civil contractors across metropolitan Melbourne and regional Victoria. Cinerari builds retaining walls, footings, slabs, pits, culverts and site establishment works to the engineer’s drawings.
Phone: 0400 692 550 · Email: hello@cineraricontracting.com
Sources
- Growth Areas Authority (now Victorian Planning Authority), Engineering Design and Construction Manual for Subdivision in Growth Areas
- Mornington Peninsula Shire, Standard Plan MP218 Pit Dimension Table and Pipe Bedding Detail
- Merri-bek City Council, Technical Note A140.05 Side Entry Grated Pit
- Yarra City Council, Drainage Design Guidelines
- Wyndham City Council, Drainage Design Guidelines (October 2020)
Information in the concreting industry changes frequently. Requirements differ by council and by site, and linked content may change or become outdated. Please always contact us for help with your important building decisions.