A slab is judged on the day the next trade walks onto it. It has to be flat, level and ready, with no rework. At Cinerari Contracting we take a slab package from your drawings, prepare the ground, fix the steel, supervise the pour and cure the concrete. Builders, project managers and civil contractors use us as the slab subcontractor they do not have to chase.
A slab subcontract has one job: take the engineer’s drawings and give you a slab that is flat, level and ready for the next trade. This is how we go about it.
We check excavation levels, bearing and the sub-base before any steel goes in, because a slab is only as good as what is under it.
Reinforcement is placed to the schedule, with the right spacing and cover, and checked before the forms are closed.
Truck and pump access, placement and finishing are agreed before pour day, so the concrete goes in as one controlled run.
Levels, finish and curing are handled so your next trade starts without grinding, patching or waiting.
A clear package avoids most disputes. This is the list we work to, whether the job is one shed slab or a long run of them. The full concrete slabs service sits behind it.
A package like this can be scoped from your drawings alone, and we tell you which assumptions we made when we quote.
Most of our slab work is commercial, industrial and civil. These are the slabs we are asked for most.
Slabs that carry the building or plant above them, built to the engineer’s design with ground preparation, steel and pour recorded at each check.
Floors for factories, warehouses and commercial buildings, built for the loads and the finish the use demands. See our industrial concrete slabs.
Slabs for sheds and garages, and hardstands for yards and laydown areas, built to the supplier’s and engineer’s requirements.
Raft slabs built to the engineer’s design, on ground only, with the ground prepared and checked before any steel goes in.
Thick, heavily reinforced pads and slabs for machinery and equipment, where the load and the levels matter.
Slabs and aprons for loading areas, where trucks, falls and levels have to work together. We also build on-ground house slabs for selected residential work.
A rate per square metre tells you little. These questions tell you how the slab will actually be built.
Ask for exclusions in writing. Sub-base supply, pumps and surface treatments are common sources of argument, so we list what is in and what is out.
Be clear who prepares and signs off the sub-base. We confirm levels and bearing before steel is fixed.
A broom finish, a trowelled finish and a floor for racking are different jobs. Agree the finish and flatness before the quote, not after the pour.
Drainage, conduits and pits cast into the slab need to be set out first. Ask who coordinates them and when.
Agree who calls the engineer or certifier and how much notice they need. We build that notice into the programme.
Rain, heat and wind change how a pour is placed and cured. Ask how the contractor plans for it and who decides to stop.
We stop at four points. Each one is a gate you can see on the programme.
Excavation and sub-base are checked against the drawings for level, compaction and bearing. Unsuitable material comes out first.
Steel is checked for size, spacing, cover and fixing against the schedule before the forms are closed.
Forms, levels, penetrations, embedments and access are walked one last time. Concrete is placed under supervision.
The finished slab is protected so it gains strength evenly, then handed over with its records.
The quickest route to a firm quote is a complete package: structural drawings and specification, the geotechnical report, site levels, access details and your programme. If part of that is missing, send what you have and we will say what else is needed.
We read the drawings against each other before we price. Where two sheets disagree, we ask before the job starts, because a question in week one costs less than a correction in week six.
In return you get a subcontractor who plans the work, keeps you informed and hands over a slab with a paper trail. Stage completions, delays and design questions reach you as they happen, not at the end of the week.
When the slab is done, the records are ready for your certifier or engineer, and the site is left tidy for the next trade.
We are a subcontractor, so every job starts with someone else’s drawings and someone else’s programme.
Commercial buildings, townhouses and multi-unit work, where the slab package has to land inside a tight sequence.
Slabs that tie into pits, chambers and service structures, and bases for infrastructure works.
Slabs for sheds, warehouses, loading areas and plant, built for the loads they will carry.
On-ground residential and shed slabs where the design is straightforward and the drawings are clear.



A slab package is more than the pour. It is also how the work is planned, recorded and kept safe.
We review drawings, levels, ground conditions and sequencing before we start, so set-out is right from day one.
Site records and photos at each check give you something to point to if a question comes up later.
Safe systems of work, proper temporary works and organised areas protect our crews, your trades and the public.
You hear when a stage is done and when something is holding the next one. Problems are raised early.
Our crews work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Drawings, specification, geotechnical report and your programme.
We check the sheets against each other and come back with a quote and questions.
Excavation, sub-base and set-out, with the first check recorded.
Edge forms and steel checked, penetrations coordinated, then a supervised pour and finish.
Curing, records and a tidy site, with the slab ready for the next trade.
A slab is priced from the drawings, not from a rate card. The same few things move the number on almost every job, and it helps to know them before the quote arrives.
We do not publish figures because no two slabs match. Send the drawings and we will price the job in front of us. For background, read our guide to what drives slab cost.
Send us the package or call and tell us about the job. We will read the drawings and come back with a quote and any questions.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.