What Is Formwork? Types, Purpose and Safety on Australian Sites

What is formwork? It is the temporary structure that moulds concrete into the desired shape and holds it in the correct position until it can carry itself.[1] Every slab, footing, wall and column that is cast in place depends on it, and when it goes wrong the consequences are serious.

This guide explains what formwork is made of, how it differs from falsework, the main systems and what the safety guidance says. We build formwork as part of our form, reinforcement and pour work, and we build to your engineer’s drawings.

What Is Formwork in Construction?

Safe Work Australia defines formwork as the surface of the form and framing used to contain and shape wet concrete until it is self-supporting.[2] The CCAA describes it as a temporary structure that moulds the concrete and holds it in position.[1] Formwork and its supports, known as falsework, are a structural system and must be designed and built accordingly.[1]

Shape

Moulds

Gives the concrete its shape and position[1]

Load

Holds

Carries wet concrete until it is self-supporting[2]

Removed

Temporary

Taken away once the concrete has enough strength[4]

Good formwork is rigid, watertight, braced and tied together so it keeps its position and shape during construction.[2] That is the standard we work to on footings, slabs, walls and civil structures.

What Is Formwork vs Falsework?

The two terms are often used together and are easy to confuse. Falsework is the temporary structure used to support a permanent structure.[3] Formwork is the mould that shapes the concrete. Safe Work Australia’s guidance notes that falsework includes the foundations, footings and all structural members supporting the permanent structural elements.[5]

Term What it is Example
Formwork The surface and framing that contain and shape wet concrete[2] Wall panels, slab edge forms, column boxes
Falsework The temporary structure that supports a permanent structure[3] Props and frames under a suspended slab
Both together A structural system that must be designed and built accordingly[1] A suspended slab, from the soffit form to the props

Types of Formwork: What Is Formwork Made Of?

Formwork is generally grouped by how it is made and reused. The sources describe traditional systems built on site from timber or plywood, and modular systems made from materials such as hardboard, plastics, steel and aluminium.[2] Steel sections are also used in formwork framing, particularly in patented systems.[1]

Type What it is Where it suits
Traditional Built on site from timber or plywood[2] One-off shapes, footings, edges and small pours
Modular or system Prefabricated panels made from materials such as steel or aluminium[2] Repeated shapes where panels are reused
Steel-framed Steel framing, particularly in patented systems[1] Large walls and repeated pours
Self-climbing Slip forms and jump forms that climb with the structure[2] Cores, silos and tall structures
Workers in hard hats and hi-vis fixing stepped formwork, with orange safety barriers and a bulk bag in the foreground

Formwork being fixed on a staged concrete structure.

A Practical Pre-Pour Formwork Checklist

So what is formwork asked to do on the day of a pour? It has to hold its shape under a heavy, wet and moving load. These are the checks we make before concrete goes in, and they are the checks worth asking any contractor about. If you only remember one answer to what is formwork for, it is this: formwork gives the concrete its shape and holds it there until it can hold itself.

  • Line and level of every form checked against the drawings
  • Bracing, ties and props in place, and not altered since the design was checked
  • Joints and edges tight enough to hold the wet concrete[2]
  • Cast-in items, sleeves and starters fixed in position
  • Access and a clear way for the concrete to reach the form
  • Release agent applied and the form clean
  • A competent person has inspected the formwork and falsework[5]

A short checklist like this is not a substitute for the engineer’s design. It is a way of making sure what was designed is what is standing on site.

What Is Formwork’s Safety Risk? Why It Matters

Formwork failure can result in concrete blowouts, falling formwork components or structural collapse, according to WorkSafe Victoria.[4] Safe Work Australia lists collapse of the formwork and falsework among the main hazards.[3] So what is formwork’s greatest risk? It is the load: wet concrete is heavy, and the structure holding it has to be right.

The guidance is consistent about what good practice looks like. A competent person produces a formwork design capable of supporting the expected dynamic and static loads.[4] Formwork and falsework should be systematically erected and dismantled by competent persons.[3] Safe work method statements must be developed for all high risk construction work.[4]

★★★★★

“We were updated each day with progress and could see the process which Luke had explained from the start.”

Rikki, Gisborne · client review

Stripping Formwork: Why Timing Matters

Removing formwork too early is as dangerous as building it badly. WorkSafe Victoria’s advice is to ensure the concrete has achieved minimum strength before formwork removal.[4] The time depends on the concrete, the member and the conditions, so the specification and the engineer set it, not a rule of thumb.

Avoid

  • Stripping on a fixed day count without checking strength
  • Removing props to speed up the next pour
  • Leaving inspection to the last minute
  • Changing a formwork design on site without checking it

Do

  • Stripping only when the concrete has reached the specified strength
  • Keeping props until the engineer says they can go
  • Inspecting formwork before the pour
  • Treating changes as design changes

Formwork vs Scaffolding

People often ask whether formwork is the same as scaffolding. They do different jobs. Formwork shapes the concrete and carries the wet load. Scaffolding provides access for people to work at height. On a concrete job you will often see both, and each has its own rules and its own competent person.

Falsework sits between the two ideas. It is a temporary support for a permanent structure, such as props under a slab, and it is part of the structural system described by the CCAA.[1] It is not scaffolding, and it is not a platform to work from.

How We Use Formwork on Site

Form, reinforcement and pour is the core of our work, and formwork is the first part of it. We build forms for footings, slabs, walls and civil structures to the engineer’s drawings, check line, level and bracing before the pour, and keep photo records at our hold points.

If you are pricing a job, ask what formwork is included, who designs it where it is complex and who strips it and when. We list those items in our quotes so two quotes can be compared line by line.

How We Work With You

1

Talk to us about your scope

Send drawings, scope and site conditions.

2

Confirm plan and pricing

We review the documents and give clear pricing based on scope and site conditions.

3

Accurate delivery

Inspection hold points keep the work accurate, with photo records.

4

Clean handover

The work is ready for the next trade, with a tidy site and clear communication.

Get a Formwork Quote for Your Melbourne Project

Cinerari Contracting builds formwork and reinforced concrete (FRP) for civil, industrial and commercial projects and selected residential works across Melbourne and regional Victoria. Send the drawings and site details, and we’ll price it.

Get a free quoteCall 0400 692 550

What Is Formwork in Construction?

Formwork is the temporary structure that moulds concrete into the desired shape and holds it in position until it is self-supporting.[1][2]

Is Formwork the Same as Falsework?

No. Falsework is the temporary structure used to support a permanent structure.[3] Formwork is the mould that contains and shapes the concrete.[2] Together they form a structural system.[1]

What Is Formwork Made Of?

Traditional formwork is typically built on site from timber or plywood. Modular systems are often made from hardboard, plastics, steel and aluminium products.[2] Steel sections are also used in framing.[1]

Who Can Erect Formwork?

Formwork and falsework should be systematically erected and dismantled by competent persons.[3]

When Can Formwork Be Removed?

Only when the concrete has achieved minimum strength.[4] The specification and the engineer set the time, and it varies with the member and the conditions.

What Is the Difference Between Scaffolding and Formwork?

Formwork shapes and holds the wet concrete. Scaffolding gives people access to work at height. They are separate systems with separate rules, although both can appear on the same job.

More Concrete and Civil Guides


Read next

Formwork in Hillside — Volume Residential, FRP Walls, and Outer-West Sites

Continue reading →


About the author

Luke Cinerari, Director, Cinerari Contracting

Luke leads Cinerari Contracting, a Melbourne civil and reinforced concrete subcontractor working with builders, developers and civil contractors across metropolitan Melbourne and regional Victoria. Cinerari builds retaining walls, footings, slabs, pits, culverts and site establishment works to the engineer’s drawings.

Phone: 0400 692 550  ·  Email: hello@cineraricontracting.com

Information in the concreting industry changes frequently. Requirements differ by council and by site, and linked content may change or become outdated. Please always contact us for help with your important building decisions.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.