Footings and foundations · Melbourne and regional Victoria

Footing excavation in Melbourne, dug to the drawing and checked before any steel goes in

★★★★★ Rated 5 out of 5 on Google

Footing excavation looks simple from the road and is easy to get wrong in the hole. The trench has to be the right depth, width and line, the bottom has to be firm and clean, and the sides have to stay put until the concrete is in. At Cinerari Contracting we carry out footing excavation to the specified depths and dimensions, remove unsuitable material, prepare the base and hold a bearing check before any reinforcement is placed.

  • Dug to the specified depth and profile
  • Unsuitable material removed
  • Bearing checked before steel
Cinerari footing excavation: reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind
★★★★★“The team was punctual, professional, and very knowledgeable, making the whole process smooth and stress-free.”nomar group · client review
★★★★★“They completed the work on time, kept the site clean, and were always happy to answer questions and offer helpful suggestions.”NO Shops · client review
10+years of experience across civil, industrial and commercial concrete in Victoria.Cinerari Contracting
Why Cinerari

Why builders choose Cinerari for footing excavation

The hole is where footing problems start. This is how we run it.

Dug to the drawing

Depth, width and line are set out and checked against the drawings, not judged by eye.

The bottom prepared

Unsuitable material is removed and the base is prepared and, where specified, blinded.

Bearing checked

The ground is confirmed as the design expects before any steel goes in.

Safe and tidy

Excavations are kept safe and tidy, ready for inspection and reinforcement.

What we do

What our footing excavation includes

Excavation is the first stage of every footing package. We carry it out as part of our footings and foundations service, or as the first part of a larger foundation job.

  • Set-outFooting positions and levels marked from your control points.
  • Excavation to designTo the depth, width and profile on the drawings.
  • Removal of unsuitable materialSoft, loose or contaminated material taken out as required.
  • Base preparationA firm, clean base, with a blinding layer where specified.
  • Safe, tidy excavationsLeft ready for inspection and for the steel to go in.

If the ground shows something the drawings did not expect, we stop and tell you before going further.

Long reinforcement cage in a footing trench with blue edge formwork and excavators working in the backgroundCleared and levelled construction site with footing positions marked out in the ground
Questions to ask

Six questions to ask about footing excavation before work starts

A trench dug badly costs more to fix than to dig again. These questions show how a contractor controls it.

How are depth and width checked?

Ask what is measured and how often, and who records it.

How is the bottom prepared?

The base should be firm and clean before steel goes in.

What happens if the ground differs?

We stop, record what we find and wait for the engineer to say how the footing should change.

How are underground services handled?

Ask how services are located before digging starts and what is done if one is found.

What happens to the spoil?

Agree who removes material and where it goes, so the site does not clog.

How is the trench kept safe?

Ask how the excavation is protected while it is open.

Hold points

Four checks in and around the excavation

We stop the job at four points, and two of them are in the excavation itself.

1

Excavation

Depth, width, line and level checked against the drawings.

2

Bearing

Ground confirmed as the design expects, with unsuitable material removed.

3

Reinforcement

Steel checked for size, spacing and cover against the schedule.

4

Pre-pour

Forms, levels and access checked. Placement is supervised.

Reading the ground

Reading the ground as the excavation goes down

The geotechnical report tells you what the ground is likely to be at certain points. The excavation tells you what it is everywhere else. We watch for changes in colour, texture and firmness as the dig goes down, and we compare what we see with the report.

Many Melbourne sites sit on clay that moves with moisture, and some carry fill left from earlier uses. Neither is a problem if it is found early and handled as the engineer directs.

When the ground differs, we stop. We record what we found, with photos, and tell you and the engineer straight away. The response might be a deeper dig, a change of founding level or removal of poor material, and it is the engineer’s decision.

That record protects everyone. It shows what was found, what was decided and when, so the file is clear at handover.

Water and weather

Rain, water and open footing excavations

An open trench and a wet day do not mix. Water softens the base, disturbs the sides and delays the steel. We plan the programme so excavations are not left open longer than they need to be, and we raise weather and water with you early.

If water collects in an excavation, it is dealt with before steel goes in. A footing cast on a softened base is not a footing the engineer designed.

Groundwater is a different matter. If it appears during the dig, we stop and tell you and the engineer, because it can affect the design as well as the programme.

Our aim is a base that is firm, clean and dry enough to be inspected when the engineer or certifier arrives.

Who we work for

Who we do footing excavation for

We are a subcontractor. Our clients carry the project and need a base they can trust.

Builders and project managers

Commercial buildings, townhouses and multi-unit work.

Civil contractors

Foundations that tie into pits, chambers and service structures.

Industrial clients

Footings for sheds, warehouses and plant.

On-ground house and shed builds

On-ground residential and shed designs.

Cleared and levelled construction site with footing positions marked out in the ground
Footing positions marked out on a cleared and levelled site.
Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind
A long trench with reinforcement in place after the dig.
Long reinforcement cage in a footing trench with blue edge formwork and excavators working in the background
A reinforced footing trench with edge formwork.
Where digs go wrong

Where footing excavation goes wrong, and how we prevent it

Most problems in the hole are easy to prevent if they are caught early.

Dug too deep or too shallow

Depth is checked against the drawings, not judged by eye.

A soft or disturbed base

The base is prepared and the bearing is checked before steel goes in.

Unexpected fill or services

We stop, record what we found and tell you and the engineer.

Water in the trench

Water is dealt with before steel goes in.

A trench left open too long

We plan the programme so the dig, steel and pour follow each other closely.

Safety and records

How we run the job

An open excavation needs controls and records.

Planned before mobilising

We review drawings, levels and ground information before we start.

Recorded as we go

Site records and photos show depths, ground and checks.

Safe systems

Safe systems of work, proper temporary works and organised areas around excavations.

Prompt updates

You hear when the dig is complete and when the ground shows something unexpected.

Where we work

Footing excavation across Melbourne and regional Victoria

We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

How it runs

From drawings to a ready base, in five steps

Send the package

Drawings, geotechnical report and site access details.

Review and quote

We check the drawings and ground information and quote with any questions.

Set out and dig

Positions set out and the excavation dug to design.

Prepare and check

Base prepared and the bearing checked and recorded.

Hand on

The excavation is ready for steel, with a record of what was found.

What shapes the price

What affects the price of footing excavation

Workers in hard hats and hi-vis fixing stepped formwork, with orange safety barriers and a bulk bag in the foreground

We price excavation from the drawings and the ground information. A few factors drive the number on almost every job.

A published figure would not fit most sites, so we do not give one. Send the drawings and we will price the job in front of us.

  • VolumeThe length, width and depth of what has to come out.
  • GroundRock, fill, clay or soft material that changes how the dig goes.
  • WaterWhether the excavation stays dry or has to be managed.
  • AccessHow plant reaches the footings and how material leaves.
  • ProgrammeHow closely the dig has to be followed by steel and concrete.
FAQ

Questions about footing excavation

How deep should a footing excavation be?
To the depth on the engineer’s drawings, which depends on the ground and the design. We dig to that depth and check the bearing before any steel goes in.
What is a bearing check?
It is a check that the ground at the bottom of the excavation is as firm as the design assumed. If it is not, the engineer decides what to do before the footing is built.
What happens if you find fill or soft ground?
We stop, record what we found and tell you and the engineer straight away. The engineer decides the response, and we carry it out.
Do you remove the spoil?
We agree this with you when we quote, so it is clear who removes material and where it goes.
What if it rains while the trench is open?
We plan to minimise the time an excavation is open, and we deal with water before steel goes in. A softened base is not left as it is.
Do you do the concrete as well?
Yes. Excavation is the first stage of our footing packages, followed by reinforcement, formwork and the pour.
Which areas do you cover?
Our crews dig across metropolitan Melbourne and regional Victoria, including Sunbury, Gisborne, Lancefield, Romsey, Woodend and Trentham.
What do you need to quote?
The structural drawings, the geotechnical report and site access details. Send what you have and we will say what else is needed.

Ready to talk about footing excavation?

Send us the drawings and the geotechnical report, or call and tell us about the site. We will come back with a quote and any questions.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.