Concrete pad footings carry a single point load into the ground: a column, a post, a piece of equipment. Each one is small next to a strip footing, but there can be dozens on a job, and every one has to sit at the right depth, the right size and the right position. At Cinerari Contracting we build concrete pad footings for commercial, industrial and civil work to the engineer’s drawings, with the same recorded checks on every pad.
Pads are repetitive, and repetition is where mistakes hide. This is how we guard against them.
The checks apply to each pad, not to the first one and a sample after it.
Pads are set out from your control points, so the columns above them land where the design puts them.
Starter bars and cast-in items are positioned and checked before the pour, not after it.
Photos and site records show what was built at each pad or group of pads.
A pad footing is an isolated block of reinforced concrete under a column, a post or a piece of equipment. The engineer sizes each pad from the load it carries and the ground beneath it. Pads sit within our footings and foundations service.
Whether the job is six pads or sixty, the method stays the same.
Pads are easy to specify and easy to get slightly wrong. These questions show how a contractor controls the detail.
Ask which control points are used and how the set-out is checked before digging.
On a long job, ask whether each pad gets a bearing and steel check or only a sample.
The bearing check should confirm the ground before steel goes in. We stop and call the engineer if it differs.
Reinforcement should be supported so it sits at the right cover, not on the ground.
Starters and cast-in items should be held and checked so they are not displaced during the pour.
On larger jobs, ask how stages are planned so each one is inspected and released.
We stop the job at four points, and each pad goes through all of them.
Size, depth and position checked against the drawings, with unsuitable material removed.
Bearing confirmed as the design expects before any steel goes in.
Bar size, spacing and cover checked, with starters in place.
Formwork, levels and access checked. Placement is supervised.
The engineer sizes a pad from the load the column delivers and the strength of the ground beneath it. A bigger load or softer ground means a bigger or deeper pad. Because the numbers come from the design, the contractor’s job is to build the pad exactly as drawn.
A pad dug too shallow may not reach the ground the engineer relied on. A pad dug too large costs more concrete and more time without adding anything. Neither is a good result, which is why we check size and depth at the first hold point.
The bottom of the pad matters as much as the dimensions. A loose or disturbed base has to be dealt with before steel goes in, and a wet base has to be addressed first.
If the ground is not what the report described, we stop and tell you and the engineer. The response, such as a deeper pad or a change of founding level, is the engineer’s decision, and we record what was found.
We are a subcontractor. Our clients carry the project and need dependable foundation crews.
Commercial and industrial buildings where pads are one package in a larger programme.
Bases for structures and equipment on infrastructure works.
Pads for plant, workshops and warehouses.
On-ground buildings with straightforward drawings.



Most pad problems are small errors repeated across many pads.
Set-out is checked against the control points before digging, and again before the pour.
Levels are checked against the drawings at the last hold point.
The bearing check catches it before steel goes in.
Starters are held in position and checked after the pour.
Water is dealt with before steel goes in, not after.
On a job with many pads, the pour needs a plan. We agree the sequence with you: which pads go first, how the truck and pump reach them, and who is on site to receive concrete.
Each pad gets a last look before it is poured: formwork, levels, starters and cast-in items. Placement is supervised so the concrete is placed without disturbing the steel.
After each pour we check that starters and cast-in items are where they should be, and record it. If anything has moved, you hear straight away.
At the end of the day, the site is left tidy and safe, and the records are updated for your file.
A pad is a small job. The records around it are what make the whole package dependable.
We review drawings, control points and sequence before the first pad is set out.
Site records and photos show what was checked at each pad.
Safe systems of work and organised areas protect crews and the public.
You hear when pads have been checked and when anything holds up the next group.
We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Structural drawings, specification and geotechnical report.
We check the drawings and quote the package with any questions.
Pads set out and excavated, first two checks recorded.
Steel and starters checked, then a supervised pour.
Records ready and the pads clear for the next trade.
We price pads from the drawings. A handful of factors drive the number on almost every job.
Pad packages vary too much for a published rate. Send the drawings and we will price the job in front of us.
Send us the drawings or call and tell us about the job. We will come back with a quote and any questions on the design.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.