Steel building footings have no room for error. The columns arrive cut to length and drilled to a pattern, and the concrete beneath them has to meet that pattern exactly. At Cinerari Contracting we build footings for sheds, warehouses and portal frame buildings to the engineer’s drawings and the steel supplier’s details, so the erectors turn up and find the base ready.
The steel is made to tight dimensions, so the footings have to be too. This is what we focus on.
We work from the engineer’s drawings and the steel supplier’s details, so cast-in items line up with the columns that follow.
Bolts, plates and starters are coordinated with the trades who depend on them and checked before the pour.
Excavation, bearing, reinforcement and pre-pour checks are recorded with photos.
We plan the footing programme around your delivery and erection dates, and tell you early if something threatens them.
A steel building needs more than a footing under each column. We build the foundation elements the structural drawings call for as part of our footings and foundations service.
Where the steel details are still to come, we tell you what we need and when, so the footing programme is not delayed.
The footing carries the building’s load, but the top of it carries the detail. The positions of cast-in bolts, the levels of plates and the location of starters are what the steel erectors measure against. If they are out, the fix is slow and awkward, so we treat them as the most critical part of the pour.
We set these items out from the drawings and the steel supplier’s details, check them before the pour, and keep a photo record. Templates and bracing hold them in place while the concrete goes in.
Coordination is the quiet work. Before we pour, we confirm with you which drawing revision applies, who has the final steel details, and whether anything has changed since the drawings were issued.
If a mismatch turns up between the structural drawings and the steel details, we raise it before the concrete is ordered. A question before the pour costs time. A discovery after it costs much more.
Light steel buildings are sensitive to movement. Many Melbourne sites sit on clay that swells when wet and shrinks when dry, and the footing design allows for that. The engineer sets the depth and size, and the footing has to be built exactly as drawn.
On the growth corridors in the west and north, we see this often. The ground may look uniform, but it can change across a single site, so we check bearing at the excavation rather than assume.
Fill is the other common surprise on industrial and semi-rural sites. Earlier uses leave soft material that was never compacted. If we find it, we stop and tell you and the engineer before placing steel.
The same approach applies whether the building is a small workshop or a large warehouse: dig to the drawing, check the ground, check the steel, then pour.
We stop the job at four points, and we check the steel-related items at the last of them.
Size, depth and position checked against the drawings, with unsuitable material removed and the base prepared.
Ground confirmed as the design expects before steel goes in.
Bar size, spacing and cover checked against the schedule, with starters in place.
Formwork, levels and every cast-in item checked against the details. Placement is supervised.
We work for the people who supply and build the structure, rather than the people who occupy it.
Footings and bases ready for your columns and frames on the agreed date.
Industrial and commercial buildings where the footings are one package in a larger programme.
Warehouses, workshops and processing buildings.
On-ground sheds where the footing design is straightforward.



Most steel building problems start with a number that is slightly out at the base.
Positions are set from the steel details, held with templates and checked before the pour.
Plate levels and finished footing levels are checked against the drawings at the last hold point.
We confirm the current structural and steel drawings before set-out.
We tell you what we need and when, so a missing detail does not hold the pour.
We keep the area clear and tidy so crews and cranes can work once the concrete is ready.
The pre-pour check is the most important hour of the job for a steel building. We walk each footing with the drawings and the steel details in hand: bolt positions, plate levels, starters and formwork all get a final look before concrete goes in.
Templates keep the bolt groups where they should be while the concrete is placed. Placement is supervised so the concrete goes in without disturbing them.
After the pour, we check positions again against the drawings and record what was built. If anything has moved, you hear about it straight away, while there is still time to deal with it.
The footings are then left clean and clear, ready for the steel to arrive.
Steel buildings go up fast once the footings are in. The record we keep makes the handover smooth.
We review drawings, levels, geotechnical requirements and sequencing before we start.
Site records and photos at each hold point show what was checked and when.
Safe systems of work, proper temporary works and organised areas.
You hear when a stage is complete and what, if anything, is holding up the erectors.
We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Structural drawings, steel details, geotechnical report and dates.
We check the drawings against the steel details and quote with any questions.
Footings set out, excavated to design, first two checks recorded.
Reinforcement and cast-in items checked, then a supervised pour.
Records ready and the footings clear for the erectors.
We price steel building footings from the structural drawings and the steel details. A few factors drive the number on nearly every job.
We do not publish figures because every building is different. Send the drawings and we will price the job in front of us.
Send us the structural drawings and the steel details, or call and tell us about the building. We will come back with a quote and any questions.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.