Commercial building foundations set the pace for everything built above them. A late or wrong footing holds up steel, slabs and every trade behind them. At Cinerari Contracting we build commercial footings, ground beams and bases from your drawings, with recorded checks before each pour, so the structure starts on time and on a base that is correct.
On a commercial job the foundations sit on the critical path. These are the four things we hold ourselves to.
We plan the foundation package around the steel, precast or concrete frame that follows it, not in isolation.
Excavation, bearing, reinforcement and pre-pour checks are programmed so the engineer or certifier can attend without holding the job.
Formwork, reinforcement and concrete placement sit with one contractor, so there is no gap between trades.
Photos and site records at each hold point support your certifier and your handover documents.
Commercial drawings usually combine several foundation elements in one package. We build each of them, to the structural drawings, as part of our footings and foundations service.
If your drawings include an element not listed here, ask. We will tell you plainly whether it is within what we do.
Commercial work is inspected, and rightly so. Our checks line up with the points an engineer or certifier wants to see.
Depth, width and line checked against the drawings, with unsuitable material removed and the base prepared.
Ground confirmed as the design expects before steel goes in. If it differs, we wait for direction.
Size, spacing, cover and fixing checked against the schedule, with photo records.
Formwork, levels, embedments and access checked. Concrete placement is supervised.
The foundation package rarely stands alone. Steel erectors, precast crews and the slab team all depend on footing positions, levels and cast-in items being right. We coordinate starters, penetrations and embedments with the trades who rely on them, so they land where the design puts them.
Staging matters on larger buildings. If the structure is built in zones, we can stage the footings to suit, releasing each zone as it is checked and signed off.
Access is the other constraint. Trucks, pumps and plant need a way in, and commercial sites rarely have much room. We plan pour sequences with you, around hoarding, neighbours and deliveries.
Where the drawings leave a question, we raise it early. A question in the first week costs far less than a correction after the pour.
Every commercial design starts with a geotechnical report. It describes the soil, the groundwater and the bearing the engineer can rely on, and the footings are sized from it. Our job is to build what the engineer drew from that information.
Melbourne ground varies widely. Clay that moves with moisture, fill left from earlier uses and rock close to the surface can all appear within a few streets of each other, which is why the bearing check matters on every job.
When the excavation shows something the report did not, we stop and tell you and the engineer. The response might be a deeper footing, a change of founding level or a different treatment, and that decision belongs to the engineer.
We record what was found, with photos, so there is a clear account of the change and the reason for it, and your certifier has what they need.
We are a subcontractor. Our clients carry the project and need a foundation package they can rely on.
Commercial buildings and multi-unit developments with a footing package priced from the drawings.
Foundations for structures that tie into pits, chambers and service works.
Bases for plant, warehouses and processing buildings.
Teams who need dependable foundation crews across several stages.



On a commercial programme, a few days lost at the foundations can ripple through every trade behind.
We confirm the current revision before set-out and before each pour.
Pits, pipes and conduits that cross footing lines are identified and coordinated with the drainage and service trades.
Hold points sit on the programme with notice built in.
Access, hoarding and neighbours are planned into the pour sequence.
Starters, ducts and embedments are listed and checked at the last hold point.
A commercial site asks more of a subcontractor than good concrete.
Organised work areas, proper temporary works and safe systems protect our crews and your other trades.
Hold point photos and site records give your certifier something to inspect against.
You hear when a stage is done and when something holds the next one. We raise problems early.
The site is left clean and the base is ready for the next trade.
The engineer designed the foundations and the certifier signs them off, so both need to see what they expect at the point they expect it. We ask early when each of them wants to inspect and build those visits into the programme.
We keep records as we go. Hold point photos, site notes and the current drawing revision are collected in one place, so when a certifier asks, the answer is ready.
Our role is to build what is drawn and report what we find. We do not alter a design on site. If the ground, a service or a clash needs a decision, it goes to the engineer and the response is recorded.
That discipline keeps the file clean for handover and protects you if a question is raised years later.
We work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Structural drawings, specification, geotechnical report and programme.
We check the sheets against each other and quote the package with any questions.
Positions set out, excavation to design, first two hold points recorded.
Reinforcement and formwork checked, last two hold points signed off, supervised placement.
Records ready and the base clear for the structure above.
We price commercial foundations from the structural drawings. The same few factors drive the number on almost every building, and knowing them early helps your budget.
We do not publish figures because every building is different. Send the drawings and we will price the job in front of us.
Send us the drawings and your programme, or call and tell us about the building. We will come back with a quote and any questions on the design.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.