Concrete slabs · Melbourne and regional Victoria

Concrete slab construction in Melbourne, built stage by stage and checked as we go

★★★★★ Rated 5 out of 5 on Google

A good slab is built in a set order, and each step depends on the one before it. At Cinerari Contracting we handle concrete slab construction for builders and civil teams: ground preparation, formwork, reinforcement, the pour, finishing and curing. This page explains how the work runs and what you should see at each stage.

  • Built in a set order, checked at each stage
  • Slabs on ground to the engineer’s design
  • 10+ years in Victorian concrete
Cinerari concrete slab construction: worker in a welding helmet fabricating a steel reinforcement cage beside orange formwork timbers
★★★★★“What stood out most was their attention to detail and commitment to quality.”nomar group · client review
★★★★★“From start to finish, the team was professional, reliable, and easy to communicate with.”NO Shops · client review
50+projects completed across civil, industrial and commercial sites in Victoria.Cinerari Contracting
Why the order matters

Why concrete slab construction is done in a fixed order

Concrete cannot be fixed once it has set, so every step before the pour has to be right. This is how we think about it. The full concrete slabs service lists the slab types we build.

The ground sets the limit

A slab is only as good as the ground and sub-base under it. We check them before anything is built on top.

Forms hold the shape

Edge forms decide the line, the level and the thickness. If they move during the pour, the slab moves with them.

Steel does the work

Reinforcement carries the tension in the slab. Wrong size, spacing or cover cannot be corrected later.

Curing finishes the job

A slab keeps gaining strength after the pour. Protecting it in that window protects the result.

The stages

The stages of concrete slab construction, from sub-base to curing

1. Excavate and prepare

Excavate to level, remove unsuitable material and place and compact the sub-base to the specification.

2. Membrane and blinding

Install membranes or blinding where the drawings call for them, and protect them from damage.

3. Form the edges

Set edge and stop-end forms to line and level, braced so they hold during the pour.

4. Fix the steel

Place mesh and bar on chairs to the schedule, with the specified spacing and cover.

5. Pour, finish and cure

Place the concrete under supervision, finish to the specified surface and protect it while it gains strength.

What we handle

What our concrete slab construction packages cover

You can engage us for the whole slab or for the stages you need. We list inclusions and exclusions in every quote.

  • Ground preparationExcavation, sub-base placement and compaction.
  • Membranes and blindingInstalled where the specification requires them.
  • FormworkEdge forms, stop-ends and bracing.
  • ReinforcementMesh, bar, chairs and edge beam steel to the schedule.
  • Edge beams and thickeningsFormed and reinforced to the engineer’s detail.
  • Placement and finishingSupervised pour, finished to level and surface.
  • JointsConstruction, control and isolation joints set out to the drawings.
  • Curing and recordsProtection while the concrete gains strength, with photos and check records.

Our slab and footing work covers jobs where the footings and the slab are built together.

Aerial view of reinforcement mesh and orange formwork ready for a concrete pour, with two workers on siteReinforcement bars inside green formwork in a footing trench, braced with timber across the top
Joints and cracking

Joints, shrinkage and why slabs crack

Concrete shrinks as it dries, and a slab will crack somewhere unless it is told where to. That is what joints are for.

Control joints

Planned weak lines that let the slab crack in a straight, tidy place instead of a random one.

Construction joints

Where one pour stops and the next begins. Their position and detail come from the drawings.

Isolation joints

Gaps around columns, walls and pits so the slab can move without loading them.

Curing and cover

Good curing and correct steel cover reduce cracking. Neither is visible once the job is done, so we record them.

Our checks

The checks we make during concrete slab construction

We stop at four points. Each one is a gate you can see on the programme.

1

Ground

Levels, compaction and bearing checked before forms go up.

2

Reinforcement

Steel size, spacing and cover checked before forms are closed.

3

Pre-pour

Forms, levels, penetrations and access walked, and the pour supervised.

4

Curing

Slab protected, then handed over with its records.

Who we work for

Who we build slabs for

We are a subcontractor, so every slab starts with someone else’s drawings.

Builders

Commercial and residential builders who need a slab package delivered to programme.

Civil contractors

Slabs that tie into pits, chambers and service structures.

Industrial clients

Slabs for sheds, warehouses and plant areas, built for the loads they carry.

Developers

Multi-unit and mixed-use projects where several slabs follow one sequence.

Cinerari worker in a hard hat and hi-vis carrying a tool beside orange stepped formwork on a worksite
A Cinerari crew member beside stepped formwork.
Workers in hard hats and hi-vis fixing stepped formwork, with orange safety barriers and a bulk bag in the foreground
Formwork being fixed ahead of a pour.
Cleared and levelled construction site with footing positions marked out in the ground
A cleared and levelled site with positions marked out.
Working with you

What we need to start concrete slab construction

To quote accurately we need the structural drawings and specification, the geotechnical report, site levels and access details. The more of that you send, the fewer assumptions we have to make.

We list the assumptions we did make in the quote, so you can see what we priced and what we did not.

During the job we tell you when each stage is complete and when something is holding the next one.

At handover your engineer or certifier gets the records, and the slab is ready for the next trade.

Where we work

Concrete slab construction across Melbourne and regional Victoria

Our crews work from Melbourne across the metropolitan area and into regional Victoria, including these areas.

MelbournePort MelbourneSunburyGisborneRiddells CreekLancefieldRomseyWoodendKynetonKilmoreBroadfordCastlemaineDaylesfordTrenthamMacedon Ranges

We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.

What shapes the price

What affects the cost of concrete slab construction

Reinforcement cage laid in a long trench with blue edge formwork, excavators and marker flags behind

Slab construction is priced from the drawings. The same few things move the number on most jobs.

We do not publish figures because no two slabs match. Send the drawings and we will price the job in front of us. For background, read our guide to what drives slab cost.

  • Area and thicknessHow much slab there is and how thick the design makes it.
  • ReinforcementThe amount and size of steel in the design.
  • Ground conditionsFill, soft spots or water that must be dealt with first.
  • Edge beams and thickeningsThe extra formwork and steel they need.
  • AccessTruck and pump access, and whether the pour is staged.
FAQ

Questions about concrete slab construction

What is concrete slab construction?
Concrete slab construction is the process of preparing the ground, setting forms, fixing reinforcement, placing and finishing the concrete and curing it, so the slab matches the engineer’s drawings.
What are the stages of building a concrete slab?
Ground preparation and sub-base, membrane or blinding, edge forms, reinforcement, the pour and finish, then curing. Each stage depends on the one before it, so we check each one before moving on.
How long does concrete take to cure?
Concrete gains strength over weeks, and most of the early gain happens in the first days. The engineer’s specification says how long curing must last and when loads can be applied. We follow it.
Why do concrete slabs crack?
Concrete shrinks as it dries. Joints are placed to control where it cracks, and good curing and correct steel cover reduce cracking. Some fine cracking is normal. Wide or growing cracks should be looked at by the engineer.
Who decides the thickness and reinforcement?
The engineer does, based on the loads and the ground. We build to the drawings and raise any difference with you rather than change it on site.
Which standards apply?
Concrete structures are commonly designed to AS 3600, and residential slabs and footings to AS 2870. We build to the drawings and specification and keep records at each check.
Can you build the footings and the slab together?
Yes. Where the design calls for it we build edge beams, footings and the slab as one package, with the sequence planned so each stage can be checked.
How do I get a quote?
Send the structural drawings and specification through the quote form or call us. A geotechnical report, levels and access details help.

Have a slab to build? Talk to the crew that builds it.

Send the drawings or call. We will read the package and come back with a quote and any questions.

Email hello@cineraricontracting.com · Melbourne and regional Victoria

Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.

How Can We Help You?

Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.