On a commercial job the slab is on the critical path. Every trade after it needs it flat, level and on time. At Cinerari Contracting we lay commercial concrete slabs for builders and developers, from sub-base through to curing, and we plan the pour sequence around your programme rather than ours.
A commercial slab package is won or lost on coordination. These are the four things we put first. Our wider concrete slabs service covers the other slab types.
Finished levels drive everything that follows, from screeds and flooring to doors and falls. We set out from your datum and check levels again before the pour.
Pour sizes, joints and stages are agreed with you so the slab fits the structure, the hoist and the trades above and below it.
Drainage, conduits and cast-in items are set out and checked before concrete arrives, not chased afterwards with a core drill.
The crew that prepares the ground is the crew that finishes the slab, so questions have one owner.
Commercial slabs vary a lot, so we price from the drawings and list the scope in the quote. A typical package looks like this.
If your package is split between us and another trade, we tell you where our scope ends so nothing falls between the two.
Most delays on a slab package come from the sequence, not the concrete. We plan it with you early.
Pours are sized to what a crew can place, finish and cure properly in a day, within the limits the engineer sets.
Joints go where the drawings put them. If a layout is awkward to build, we raise it before the pour, not after.
Truck routes, pump position and hoist availability are agreed in advance, including who controls the gate.
We tell you when the slab can take foot traffic, formwork loads or stored material, so the next trade is not guessing.
A price per square metre hides the details that cause arguments. Ask these first.
Agree who provides the datum and who checks set-out. We confirm levels against your survey before steel goes in.
A broom finish, a trowelled finish and a surface ready for flooring are different jobs. Agree the finish and tolerance up front.
Ask how curing is done and for how long. Poor curing is a common reason a good slab disappoints later.
Delays on pour day happen. Ask how the contractor handles a stop and where the planned stops are.
Plumbers, electricians and fire services all cast things in. Ask who walks the slab with them before the pour.
Ask what you get at handover: photos, check sheets and anything your certifier needs.
Each pour has four gates. You can see them on the programme.
Levels, compaction and bearing are checked against the drawings before anything is built on top.
Reinforcement is checked for size, spacing and cover before forms are closed.
Forms, levels, penetrations, embedments and access are walked one last time, with the pour supervised.
The slab is protected while it gains strength, then handed over with its records.
We work as a subcontractor, so each job runs to your drawings and your dates.
Offices, retail, medical and community buildings, where the slab sits inside a fixed construction sequence.
Multi-unit and mixed-use projects, where one slab package has to meet the programme of many trades.
Slabs for service structures, plant rooms and control buildings that tie into civil works.
On-ground slab work inside or beside existing buildings, where access and neighbouring trades set the limits.



A firm quote starts with a full package: structural drawings and specification, the geotechnical report, survey levels, site access details and your programme. If something is missing, send what you have and we will list what else we need.
We read the drawings against each other before we price. Where a structural sheet and an architectural sheet disagree, we ask first, because a question in the first week costs less than a correction in the sixth.
You get a subcontractor who keeps you informed. Stage completions, delays and design questions reach you as they happen.
At handover your engineer or certifier gets the records, and the next trade gets a slab that is clean, level and ready.
The pour is one day. The rest is planning, safe access and records.
We review drawings, levels, access and sequencing before we start, so set-out is right from day one.
Safe systems of work, sound temporary works and organised areas protect our crews, your trades and the public.
Site records and photos at each check give you something to point to if a question comes up later.
Offcuts and waste are cleared, so the next trade can start without a clean-up.
Our crews work from Melbourne across the metropolitan area and into regional Victoria, including these areas.
We also work the growth corridors in Wyndham, Craigieburn, Whittlesea and Casey. If your site is not listed, ask. See every area we cover.
Drawings, specification, geotechnical report, levels and your programme.
We check the sheets against each other and quote with a clear list of inclusions.
Pour sizes, joints, access and key dates are settled before we mobilise.
Ground, forms and steel are checked, then the pour is supervised and finished.
Curing, records and a tidy site, with the slab ready for the next trade.
A slab is priced from the drawings, not from a rate card. A few items move the number on almost every commercial job.
We do not publish figures because no two slabs match. Send the drawings and we will price the job in front of us. For background, read our guide to what drives slab cost.
Send the structural drawings and your key dates. We will read the package and come back with a quote and any questions.
Email hello@cineraricontracting.com · Melbourne and regional Victoria
Information about standards and construction practice changes over time. Every site is different and every job is quoted from its own drawings. Please contact us for advice on your project.
Fill in your details, we’ll be in touch to answer your questions. No hard sell. Just help.